Similar Projects
Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

GC Services for Peachtree MS Site Access Improvements
Results
Less than $1,000,000 est. value
Atlanta, Dunwoody, GA 30338

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Cedar Walk Apartments
Post-Bid
Hinesville, GA 31313

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

K-12 New Parking Lot
Post-Bid
GA

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Concrete Walkway - Governors Drive
Post-Bid
Forest Park, GA 30297

Construction of Streetscape and Atlanta Highway Sidewalk Phase II
Term Contract
Results
Bogart, GA 30622

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Parking Lot at Tom Pittman Field
Results
Aragon, GA 30104

Cumming City Center, FCHS Parking Lot
Post-Bid
Cumming, GA 30040

Davis Road Sidewalks
Results
Stockbridge, GA 30281

Last Updated 10/14/2020 05:05 AM
Project Title

Sidewalk Work (Annual Contract)

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31095   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Form and pour a 4" thick, 3000 PSI concrete for sidewalks over compacted earth 3’ from the back of the curb. Width 60” Sidewalk to have 1" deep by 1/4" wide scored joints every 5' apart. Intersects other paved surfaces. 2. Proper grading and cleanup of surfaces related to sidewalks, stamping, curb and gutter and driveways repairs. 3. If required, Detectable Warning Pads meeting latest ADA requirements to be installed at road crossings. 4. Contractors are responsible for all materials, labor, supervision, technical personnel, machinery, tools, equipment and services. 5. Price is to include all removal, disposal and cleanup of all asphalt and/or concrete materials. 6. Service will be required on an as needed basis throughout the year during the contract period.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents