Similar Projects
Attessa Motorsports Complex Master Plan
New Construction, Alteration
Conception
Casa Grande, AZ 85193

Superstition Fuel Tank Replacement and Drainage Improvements - CP1005 - City of Mesa
Infrastructure
Conception
$3,007,019 est. value
Mesa, AZ

Attesa Motorsports Complex - Garages & Paddock
New Construction
Design
Casa Grande, AZ 85193

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Exploratory Soil Borings
Infrastructure
Bidding
$5,000 est. value
Bullhead City, AZ

RFQ D/B - North Marana Sewer Interceptor Improvements
Infrastructure
Bidding
$10,300,000 est. value
Marana, AZ 85653

Cactus Middle School Site Improvements
Post-Bid
Casa Grande, AZ 85122

Site Preparation for AMARG Tension Fabric Structures
Post-Bid
Tucson, AZ 85707

Rockfall Mitigation
Results
Less than $3,500,000 est. value
Bisbee, AZ

Purchase and Development of City-Owned Land - Danelle Plaza
Results
Tempe, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Merkin Vineyards Grading and Site Utilities Phase I
New Construction
Construction
Cottonwood, AZ

Echo Ramp East Overlay - CP0927 - City of Mesa
Infrastructure
Conception
$5,227,296 est. value
Mesa, AZ 85215

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Subsurface Utility Excavation Services 2 Step Job Order Contract
Term Contract
Bidding
Phoenix, AZ

Reported 07/01/2022 12:00 AM
Project Title

Bouse Kofa Dome Tap Gila Reconductoring Construction Project

Physical Address View project details and contacts
City, State (County) Yuma, AZ   (Yuma County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 to $23,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all labor, supervision, materials, licenses, permits, insurance, transportation, and equipment necessary for: Dome-Gila: Removing existing copper conductor and reconductoring 1.23-miles of transmission line with ACSS conductor from structure 115/1 to the Gila side of dead-end structure 116/4. Removing two (2) existing steel overhead ground wires and installing one (1) Government-furnished optical ground wire and installing one (1) Government furnished steel overhead ground wire on 1.23-miles of transmission line. Splicing optical overhead ground wire to optical overhead ground wire at structure 115/1. Splicing optical overhead ground wire to fiber optic distribution cable at structure 116/4. Splicing pigtail connectors to fiber optic distribution cable in the communications room in the Gila maintenance building. Install Government-furnished fiber optic patch panel in existing communication rack in the Gila maintenance building communication room. End to end testing of the fiber optic system between Dome Tap and the patch panel in the Gila maintenance building communications room. Kofa-Dome: Removing existing copper conductor and reconductoring 7.5-miles of transmission line with ACSS conductor. Removing two (2) existing steel overhead ground wires and installing one (1) Government-furnished optical ground wire and furnishing and installing one (1) steel overhead ground wire on 7.5-miles of transmission line. Removing eight (8) transmission line wood pole structures and one (1) transmission line light-duty steel pole structures. Installing eight (8) new transmission line light-duty steel structures and one (1) new transmission line heavy-duty steel pole structure. Furnishing, installing and terminating fiber optics at Kofa Substation (KOF). Furnishing and installing aluminum conductor and associated fittings at KOF. Bouse Kofa 161kV Transmission Line Reconductoring 76.1-miles of 161-kV transmission line with ACSS conductor. Removing existing overhead ground wires and furnishing and installing 84.3-miles of one (1) optical ground wire and 75.9-miles of one (1) steel overhead ground wire. Removing 83 transmission line wood pole structures and eight (8) transmission line light duty steel pole structures. Installing 88 new transmission line light-duty steel structures and two (2) new transmission line heavy-duty steel pole structures. Furnishing, installing and terminating fiber optics at Bouse Switchyard (BSE) and Kofa Substation (KOF)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents