Similar Projects
Utility Undergrounding for Golden Shores
Alteration
Bidding
Sunny Isles Beach, FL 33160

Electric Vehicle Charging Stations for Town Parking Locations
Alteration
Bidding
Bay Harbor Islands, FL

Installation of Solar Photovoltaic Systems
Post-Bid
Miami, FL

Jackson Dade Head Start Electrical Meter Upgrade
Post-Bid
Less than $11,500 est. value
Miami, FL 33136

LED Smart Lighting and Smart County Systems
Results
Less than $176,516,780 est. value
Miami, FL 331281983

Trip Saver II Recloser Pole Top
Results
Homestead, FL 33030

Generator Exhaust Upgrade
Alteration
Bidding
$52,000 est. value
Coral Gables, FL 33134

Eureka Adult Day Training Center
Renovation
Post-Bid
Miami, FL 33157

Design Build Solar Panel Installation at City Facilities
Results
South Miami, FL

J059--Service: Inspection, Repair, Testing, and 36 Month Maintenance of Electrical Distribution System
Term Contract
Bidding
Miami, FL 33125

EV Charging Stations
Post-Bid
Miami Lakes, FL 33014

Banyan Bowl Stage Light Project
Results
Pinecrest, FL 33156

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Bidding
Less than $20,000,000 est. value

6140--Battery Bank Replacement
Post-Bid
Miami, FL 33125

LED Lighting Fixtures Replacement at Miami Animal Import Center
Results
Miami, FL 33177

Last Updated 09/15/2021 12:12 PM
Project Title

Sanitary Sewer Submersible Electrical Control Panels Installation Project

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33133   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $540,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consist of, but is not necessarily limited to the following: demolition, removal and disposal of existing control panel, telemetry antenna and associated foundations, installing the Owner Furnished Submersible Control Panels, delivering and installing all Contractor furnished materials related the construction of all listed Pump Station including new support structures (e.g. concrete slabs, panel supports), coordination with FPL, the City and Custom Controls Technology, cleaning and startup testing as required, maintenance of uninterrupted sewer collection system service; restoration of area to preconstruction conditions; together with all appurtenant for miscellaneous items and work for a completed project.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents