Similar Projects
Resurfacing
Bidding
$5,484,117 est. value
FL

Front Beach Road Segment 4.1 Powell Adams
Bidding
Panama City Beach, FL 32413

Restore Maintenance Road GATR Site
Post-Bid
Panama City, FL

Repair Restore Expeditionary Road
Post-Bid
Panama City, FL 32403

Street Resurfacing Project - FY 2019
Results
Less than $743,500 est. value
Panama City Beach, FL

Bituminous Courses
Results
Less than $524,707 est. value
FL

S. Silver Lake Road Dirt Road Stabilization Project
Bidding
FL 32438

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Hugh Thomas Drive Improvements
Results
Callaway, FL 32404

City-Wide Street Repairs
Post-Bid
Mexico Beach, FL

Widen/Resurface Existing Lanes/Sidewalk
Results
Less than $505,626 est. value
FL

Street Resurfacing Project FY 2021
Post-Bid
Panama City Beach, FL 32413

Roadway Repairs
Results
Less than $980,825 est. value
Lynn Haven, FL

Wildwood Road Improvements
Post-Bid
Less than $422,000 est. value
Panama City Beach, FL 32407

Roadway Repairs
Results
Less than $520,705 est. value
Callaway, FL

Last Updated 02/02/2021 04:09 PM
Project Title

Wiregrass Boulevard and West Smith Road Dirt Road Stabilization Project

Physical Address View project details and contacts
City, State (County) FL 32409   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $477,856
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for the stabilization of Wiregrass Boulevard and W. Smith Road. The combined total project length is approximately 0.88 miles. The Wiregrass Boulevard project limits extend northward from Newman Point Road to the dead end at the northern end of Wiregrass Boulevards. The W. Smith Road project limits extend northward from Marina Bay Drive to McKenzie Road. The project roadway area will be stabilized with asphaltic concrete pavement and sod stabilization of the roadside shoulders.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents