Similar Projects
Lake Street Clair Hike / Bike Trail Reconstruction and North Marina Walk Repair
Bidding
Brighton, MI 48045

2021 Sidewalk Replacement Program
Bidding
Chesterfield Township, MI

Green Infrastructure Retrofits for Center Line DDA Parking Lot
Post-Bid
Less than $350,000 est. value
Center Line, MI

Sitework and Parking Lots
Post-Bid
Warren, MI

Nature Trail
Results
Less than $822,000 est. value
Sterling Heights, MI

Senior Center South Parking Lot Addition
Results
Sterling Heights, MI

Center Campus Lot 8 and South Campus Lot 1 Reconstruction
Post-Bid
Warren, MI 48089

Union Lake Road Sidewalk Program
Results
Harrison Township, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

Shelden Trails Development and Construction (Phase 1)
Results
Less than $223,481 est. value
Shelby Township, MI 48316

Sidewalk Rehabilitation Program - 2020 CDBG
Post-Bid
New Haven, MI 48048

Remove Brick Pavers and Install New Concrete Sidewalks
Results
Warren, MI

MISD - Admin Parking Lot Expansion
Post-Bid
Less than $2,048,000 est. value
Clinton Township, MI

2020 Sidewalk Repair Program
Results
Less than $537,000 est. value
Eastpointe, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Last Updated 10/01/2020 11:48 AM
Project Title

2020 Sidewalk Gap Program

Physical Address View project details and contacts
City, State (County) Shelby Township, MI 48316   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work proposed consists of the installation of new sidewalks on Shelby Road, Mound Road, Schoenherr Road, 21 Mile Road, 22 Mile Road, 24 Mile Road, and 25 Mile Road within the right-of-way or easements. The approximate quantities of work involved for this project are as follows: Station Grading 8,300 Ft Sidewalk Ramp, ADA, Modified 197 SF Sidewalk, Conc, 4 Inch 47,100 SF Sidewalk, Conc, 6 Inch 4,700 SF Dr Structure, 48 Inch Dia. 1 Ea Sewer, Cl IV, 12 inch, Tr Det B 95 Ft Sewer, Cl IV, 18 inch, Tr Det B 16 Ft

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents