Similar Projects
Last Updated | 08/12/2022 01:02 AM |
Project Title | ADA Curb Ramp Improvements - Dover - Foxcroft, Hampden, Mount Desert Island and Southwest Harbor - Region 4 |
Physical Address | View project details and contacts |
City, State (County) | Dover Foxcroft, ME 04426 (Piscataquis County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Concrete, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $474,945 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The lowest responsive bidder must demonstrate successful completion of projects of similar size and scope to be considered for the award of this contract. Description: State Project 024807.00, WIN 24807.00. Location: In Hancock County: Asset #CR12707 is located in Mount Desert Island on Route 102 at 1091 Main Street. Asset #CR12709 is located in Mount Desert Island on Route 102 at 1099 Main Street. Asset #CR12716 is located in Mount Desert Island on Route 102 at 1132 Main Street. Asset #CR12960 is located in Southwest Harbor on Route 102 at 217 Main Street. Asset #CR12961 is located in Southwest Harbor on Route 102 at 217 Main Street. Asset #CR09563 is located in Southwest Harbor on Route 102 at 293 ME. Asset #CR12719 is located in Southwest Harbor on Route 102 at 293 ME. Asset #CR12971 is located in Southwest Harbor on Route 102 at 332 Main Street. Asset #CR12970 is located in Southwest Harbor on Route 102 at 332 Main Street. In Piscataquis County: DF RT 153 ADA Ramp 1 is located in Dover-Foxcroft on Route 153 at 42 North Street. DF RT 153 ADA Ramp 2 is located in Dover-Foxcroft on Route 153 at 42 North Street. Asset #CR13707 DF RT 15 ADA Ramp 1 is located in Dover Foxcroft on Route 15 at 199ME. Asset #CR13707 DF RT 15 ADA Ramp 2 is located in Dover Foxcroft on Route 15 at 199ME. DF RT 15 ADA Ramp 3 is located in Dover-Foxcroft on Route 15 at 202 ME. DF RT 15 ADA Ramp 4 is located in Dover-Foxcroft on Route 15 at 202 ME. In Penobscot County: Asset #11501 is located in Hampden on Routes US 202 and 93 State Route 9. Asset #11502 is located in Hampden on Routes US 202 and 93 State Route 9. Asset #11500 is located in Hampden on Routes US 202 and State Route 9. Asset #11499 is located in Hampden on Routes US 202 and State Route 9. No Asset # is located in Hampden on Routes US 202 and State Route 9. Outline of Work: ADA Curb Ramp Improvements, and other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to George MacDougall at (207) 624-3431, use electronic RFI form or email questions to RFI- Contracts. MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable State Laws. The right is hereby reserved to the Maine DOT to reject any or all bids. MEDOT - ADA Curb Ramp Improvements - Dover - Foxcroft, Hampden, Mount Desert Island and Southwest Harbor - Region 4 Please note: The Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |