Similar Projects
115 N. Federal Highway Infill Mixed-Use Redevelopment Project
New Construction
Bidding
Boynton Beach, FL 33435

Belvedere Heights Phase 2 Sidewalks and Ped Lights Federalized
Infrastructure
Bidding
$1,400,000 est. value
West Palm Beach, FL

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Underground Contractor Services
Term Contract
Results
Highland Beach, FL 33487

Amazon Delivery Station
Build-Out, Infrastructure - 120,282 SF
Pending Verification
Riviera Beach, FL 33404

Gateway Boulevard and Military Trail Intersection Improvements
Post-Bid
$1,360,000 est. value
West Palm Beach, FL 33472

Construction of a Concrete Parking Area and Access Drive for the Hypoluxo Scrub Natural Area
Results
Hypoluxo, FL 33462

Belvedere Heights Phase 1, Sidewalks and Pedestrian Lights
Infrastructure
Post-Bid
West Palm Beach, FL

Roosevelt Estates ADA and Traffic Calming Improvements
Results
Less than $900,000 est. value
West Palm Beach, FL 33402

1913 Aicher House Deck and Ramp Project
Results
Jupiter, FL 33458

Design and Build of Downtown CRA Parking Lot Project
Results
Lake Park, FL 33403

Bike Lane/Sidewalk/Landscaping (BDI)
Results
Less than $540,483 est. value
FL

ADA Retrofits
Results
Less than $600,000 est. value

Last Updated 09/09/2021 04:38 PM
Project Title

Install an American with Disabilities (ADA) Compliant Access Ramp for Lantana Beach

Physical Address View project details and contacts
City, State (County) Lantana, FL 33462   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Install an ADA Compliant Access Ramp for Lantana Beach. 2. Obtain all environmental and construction permits 3. The beach area affected by the construction will be returned to “as good or better condition” at the completion of work. 4. The beach will be open to the public during all phases of construction. Therefore, the Contractor shall be responsible for keeping the worksite protected from the elements so as to prevent any damage to the beach and/or injury to its users as a result work performed throughout this project

Details

Division 09 - Finishes.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents