Similar Projects
Last Updated | 01/25/2022 08:54 AM |
Project Title | Thornton Park Swimming Pool - Replacement of Hot Water Boilers |
Physical Address | View project details and contacts |
City, State (County) | Shaker Heights, OH 44122 (Cuyahoga County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal and proper disposal of the existing boilers and the installation of a new gas fired hot water boilers at Thornton Park Swimming Pool located in the City of Shaker Heights, Ohio. The demolition and disposal of three existing boilers (three, Patterson Kelly Thermific Boilers – installed in 2002), sheet metal, expansion tanks and all related plumbing. Installation of new free standing vertical gas fired boilers, all related motors and pumps to include but not limited to: all plumbing, electrical, gas and sheet metal work required for the installation and operation of boilers. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |