Similar Projects
Middle Water Storage Tank Foundation Stabilization
Post-Bid
Less than $200,000 est. value
Clifton, CO 81520

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Liquid De-Icer Storage Tanks
Results
Arvada, CO 80002

Widefield Terminal Tank Rehabilitation
Results
Colorado Springs, CO 80947

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Sunset Mesa Water Tank and Pump Station Project
Results
Less than $4,000,000 est. value
Montrose, CO

Mesa Tank Valving Project
Infrastructure
Post-Bid
Manitou Springs, CO

Potable Water Storage Tank Cleaning and Comprehensive Inspection
Results
Steamboat Springs, CO 80477

2-MG Water Storage Tank 18
Infrastructure
Post-Bid
Castle Rock, CO

Construction Services for 2.0MG Elevated Tank
Results
Brighton, CO 80601

High Zone Tank to Low Zone Tank Yard Piping
Infrastructure
Post-Bid
Greenwood Village, CO

Water Storage Tank Renovation Project
Results
Sterling, CO 80751

Shadows Finished Water Storage Tank Rehabilitation Project
Results
Breckenridge, CO 80424

Cedar Heights Tanks 1 and 2 Replacement
Results
Colorado Springs, CO 80904

Replace B590 Storage Tanks, Peterson AFB
Results
Colorado Springs, CO

Last Updated 12/10/2021 02:35 PM
Project Title

Fowler Secondary Containment Structure

Physical Address View project details and contacts
City, State (County) CO   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified General Contractors are invited to bid on the construction of a concrete secondary containment structure to be constructed at the Colorado Department of Transportation (CDOT) Fowler facility located at 33936 Highway 167 Fowler, CO

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents