Similar Projects
Link Road/Boonsboro Road Intersection Improvements - City of Lynchburg
Infrastructure
Conception
$2,015,896 est. value
Lynchburg, VA 24503

Link Road/Boonsboro Road Intersection Improvements - City of Lynchburg
Infrastructure
Conception
$2,015,896 est. value
Lynchburg, VA 24503

Tinbridge Hill Overlook
Infrastructure
Bidding
$2,600,000 CJ est. value
Lynchburg, VA 24504

Wastewater Treatment Plant Outfall Stabilization
Infrastructure - 1,560 SF
Bidding
$3,000,000 CJ est. value
Lynchburg, VA 24504

Governor's Quad Pavers
Post-Bid
Radford, VA 24141

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Subgrade Stabilization
Infrastructure
Results

Jerry Falwell Center
New Construction
Pending Verification
Lynchburg, VA 24515

EDM Building Addition
Addition, Demolition, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Lynchburg, VA 24502

V.E.S. Road Waterline Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Lynchburg, VA 24503

Rivermont and Bedford Avenue Intersection Improvements
Infrastructure
Post-Bid
$435,000 est. value
Lynchburg, VA 24503

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Fox Crossing Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Lynchburg, VA 24502

Kemper Street Sidewalk Improvements
Infrastructure
Post-Bid
$325,000 CJ est. value
Lynchburg, VA 24501

Last Updated 09/09/2022 10:02 AM
Project Title

Leesville Road Fitness Center

Physical Address View project details and contacts
City, State (County) Lynchburg, VA 24502   (Lynchburg City County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plan is for a new fitness center. As of September 9, 2022, the project is in final planning. Architect information is unknown. General Contractor has been selected and building permits approvals are pending. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents