Similar Projects
HVAC System Upgrade Phase 2
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Cheyenne, WY 82001

Moyer Building Medium Density Fibreboard (MDF) Cooling Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Powell, WY 82435

H941--Airflow Test and Balance (Tab) and HVAC Controller Services
Term Contract
Post-Bid
Loveland, CO - Cheyenne, WY 82001

Replace the Pneumatic HVAC controls
Alteration
Post-Bid
Cody, WY 82414

Story Elementary HVAC Upgrade
Alteration
Results
$100,000 est. value
Story, WY 82832

Purchase and Installation of Boiler for County Courthouse Snowmelt System
Renovation
Results
$117,343 CJ est. value
Laramie, WY 82070

Cooling Upgrades
Term Contract
Post-Bid
Casper, WY 82601

Rocky Mountain High School Ventilation Improvement
Renovation
Results
$419,914 CJ est. value
Cowley, WY 82420

UW Cheyenne Family Medicine Clinic - Temperature Controls Upgrades
Alteration
Post-Bid
Laramie, WY 82071

Sheridan College Whitney Center for the Arts IT Core ACU-2 Replacement
Renovation
Results
$245,735 CJ est. value
Sheridan, WY 82801

Exhaust Fans for Agriculture Building
Alteration
Post-Bid
Laramie, WY 82071

Waste Water Collections Building HVAC Upgrades
Renovation
Results
$103,000 CJ est. value
Casper, WY 82609

As Needed HVAC Testing and Balance Services at the Thyra Thompson Building
Alteration
Post-Bid
Casper, WY 82601

As Needed HVAC Services at the Thyra Thompson Building
Alteration
Post-Bid
Casper, WY 82601

Web Based HVAC Control System
Alteration
Post-Bid
$200,000 est. value
Worland, WY

Last Updated 04/13/2023 06:09 PM
Project Title

Coal Boiler Removal

Physical Address View project details and contacts
City, State (County) Gillette, WY 82716   (Campbell County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $179,810 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Coal Boiler Removal As a Bidder I have examined the plans, specifications, and related Contract documents, the site of the proposed work and being familiar with all the conditions surrounding the proposed project, including the availability of materials and labors, hereby proposed to furnish all labor, materials, supplies and to complete the project in accordance with the Contract Documents, within the time set forth therein, and at the price stated below. These prices are to cover all expenses incurred in the performance of the work required under the Contract Documents. As a Bidder I will complete the Work for the following Items Bid: Line 1: Paintbrush Coal Boiler Line 2: Rawhide Coal Boiler Line 3: Wagonwheel Coal Boiler Work to begin June 1, 2023 and be completed on or before August 4, 2023. Any questions in regard to this bid should be directed to: Brandon Mehling Assistant Supervisor of Buildings and Grounds 109 N. Gurley Gillette Wyoming 82716 Phone 307-682-2750 Apprenticeship Utilization Program (W.S. 16-6-901 - 16-6-902). "For all public works awarded by the State of Wyoming, the University of Wyoming, a community college or a school district pursuant to W.S. 16-6-101 through 16-6-206 estimated to cost one million dollars ($1,000,000.00) or more, a contractor who commits to ensure that not less than ten percent (10%) of the labor hours shall be worked by apprentices shall have his bid considered as if his bid were one percent (1%) lower than the actual dollar value of his bid." The Apprenticeship Utilization Program allows for a One percent (1%) bid preference on all public works projects costing over $1,000,000.00. Each Bid must be accompanied by a Bid Bond payable to Campbell County School District for ten (10) percent of the Base Bid. The Bid Bond pledges that the Bidder will enter into a contract with Campbell County School District on the terms stated in the bid. The successful Bidder shall provide a 100% percent of the contract Performance and Payment Bond or a Letter of Credit or any other security as approved by Campbell County School District as stated in the Instructions to the Bidder. The General and Detailed Specifications attached are considered as an integral part of this proposal and any changes are duly noted and made part of this proposal at the prices, quantity, quality, and specified delivery date. Campbell County School District is an Equal Opportunity Employer, and all awards will be governed by the Equal Opportunity Clause. Campbell County School District reserves the right to accept or reject any items, any part or all parts, any section or all sections, any bid or all bids as stated in the specifications; to waive any irregularities or informalities, or to re-bid or re-advertise for bids if it is determined to be necessary or desirable; and reserves the right to let the bid in any manner it sees fit. Campbell County District will not be bound to accepting the low bid, but rather the bid they feel will be in the best interest of the School District.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents