Similar Projects
UC Memorial Hall Roof & Facade
Post-Bid
Less than $3,582,500 est. value
Cincinnati, OH

UC Logan Hall Roof Replacement
Post-Bid
Less than $414,832 est. value
Cincinnati, OH

Muntz Hall Roof Rehabilitation
Results
Less than $825,000 est. value
Cincinnati, OH 45221

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

UC Kettering Kehoe-Mid Wing Roof Replacement
Post-Bid
Less than $1,250,000 est. value
Cincinnati, OH 45267

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Envelope Services
Post-Bid

Mill Creek Primary Settling Skimming Building Roof Replacement
Results
Cincinnati, OH 45204

Roofing Repair and Maintenance
Post-Bid

Great American Ballpark 2020 Concrete and Waterproofing Repairs
Results
Less than $130,000 est. value
Cincinnati, OH 45202

UC French East Building Roof Replacement
Post-Bid
Less than $1,100,000 est. value
Cincinnati, OH 45219

PBS 2020 Concrete and Waterproofing Repairs
Results
Less than $685,000 est. value
Cincinnati, OH

Community Center Roof Replacement Phase Two Project
Post-Bid
$295,000 est. value
Cincinnati, OH 45246

TUC Flat Roof Revitalization
Results
Less than $844,000 est. value
Cincinnati, OH 45219

Hamilton County-DDS, Franks Adult Center Roof Restoration
Results
Less than $428,000 est. value
Cincinnati, OH 45248

Last Updated 04/23/2021 11:19 AM
Project Title

Commons Building and Gymnasium Entrance Roof Replacement

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45243   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $132,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is limited to the complete removal and replacement of existing roofs for the Madeira High School Gymnasium Entrance and Commons Buildings. Existing EPDM roof membrane and ballast is to be removed from each roof and new fully adhered EPDM roofing to be installed on each roof. Roof drains, roof penetrations and parapet caps to be removed, salvaged and reinstalled on each roof following installation of new fully adhered EPDM membrane

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents