Similar Projects
Edmund - Mineral Point Const / Mill and Overlay
Infrastructure
Conception
$1,000,000 to $1,999,999 est. value
Mineral Point, WI 53565

2021 La Salle and Third Street Improvements
Infrastructure
Post-Bid
Rewey, WI

Seal Coat and Wedging on Township Roads
Infrastructure
Post-Bid
Avoca, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Avoca - Richland Center, STH 133 - West County Line; Muscoda - Lone Rock, STH 80 - STH 130
Results
Avoca, Lone Rock, Muscoda, Richland Center, WI

Seal Coat
Infrastructure
Post-Bid
$200,000 est. value
Barneveld, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Spring Green - Madison, Wisconsin River to Oak Street
Infrastructure
Post-Bid
$2,000,000 to $2,999,999 est. value
Dodgeville, Madison, WI 53595

2021 Town Road Improvement Discretionary - Keough Springs Road
Results
Linden, WI 53553

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

2021 Infrastructure Improvements
Results
Less than $1,250,000 est. value
Ridgeway, WI 53582

2021 Street Reconstruction
Results
Dodgeville, WI 53595

Dodgeville - Hollandale, Diamond Oaks Drive to CTH K
Infrastructure
Results
Dodgeville, WI 53595

Asphalt Maintenance Milling STH 23
Infrastructure
Results
Dodgeville, WI

County Highway Improvement CTH N (CTH NN – STH 133)
Infrastructure
Results
WI

Last Updated 06/22/2022 03:33 AM
Project Title

Shared Use Trail / Hillside School Road - CTH C

Physical Address View project details and contacts
City, State (County) Dodgeville, WI   (Iowa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In-Place Asphalt Pavement Recycling: Shared Use Trail - Hillside School Road to CTH C Town of Wyoming; +/- 1.255 Miles. The work under this contract shall consist of pulverization/recycling to include: The pedestrian / cycling shared use trail form the intersection of Hillside School Road northerly Iowa County Highway Department 1215 N Bequette Street Dodgeville WI 53533-0078.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents