Similar Projects
Campbell County Police Station Reroof
Post-Bid
Alexandria, KY

Phase I Parkway Place (Ky 1-3) Roof Replacement
Post-Bid
Louisville, KY 40216

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Boone County Schools Roofing 2020
Post-Bid
Florence, KY 41042

Campbell County Schools Roofing
Results
Alexandria, KY

Roofing Envelope Services
Post-Bid

Replace Basement Windows at Golden Tower With Some Limited Acoustical Ceiling and HVAC Work
Results
Covington, KY

H. Temple Spears Roof Replacement
Post-Bid
Louisville, KY 40210

Metal Roof Community and Senior Center
Results
Independence, KY 41051

Partial Roof Replacement at Various Schools
Post-Bid
Louisville, KY 40299

Lodge Roof Replacements Greenbo and Carter Caves State Resort Park
Results
Less than $705,500 est. value
Frankfort, KY 40601

Partial Roof Replacement at Newcomer Academy
Post-Bid
Louisville, KY 40218

Roof Replacement - Bowman Field License Branch
Results
Louisville, KY 40205

Partial Roof Replacement at Seneca High School
Post-Bid
Louisville, KY 40220

Last Updated 01/07/2021 09:20 AM
Project Title

EKCC Repair Replace Roofs

Physical Address View project details and contacts
City, State (County) West Liberty, KY 41472   (Morgan County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,579,518
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Administration building, four housing units, elevator tower, and guard towers. The existing approximately 200,000 square foot roof to be removed is a loose laid ballasted EPDM roof on metal deck and concrete deck respectively. The new roof system is a SBS Modified Asphalt Two Ply system that is cold adhered over rigid board insulation system. The existing roof drains are to be reused. All pre-finished metal roof coping caps, flashings, accessories and terminations are included. Existing lightning protection system shall be removed, stored, replaced, and recertified. Some minor E.I.F.S. patch and repair will be required. The razor ribbon on the roof will be relocated to brackets mounted to the side of the building with the exception of the mound of wire closest to the entry of the facility. The razor wire in that location will need to be removed, and reinstalled once that roof section is complete. There is a series of six small windows that will be removed to accommodate roof flashing installation. The openings will be closed with cmu and the EIFS will be patched back.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents