Similar Projects
Vineyard Wind 2 Route and Mother's Park Pump Station - Town of Barnstable
New Construction
Conception
$28,000,000 est. value
Barnstable, MA

Scenic Highway Mixed-Use Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Bourne, MA 02532

RFQ Contractor - Nauset Regional High School - GC
Addition, Demolition, Renovation, Infrastructure - 214,650 SF
Bidding
$105,000,000 CJ est. value
Eastham, MA 02642

Herring River Restoration Project Chequessett Neck Road Bridge and Water Access Facility Construction
New Construction, Infrastructure
Bidding
$29,800,000 CJ est. value
Wellfleet, MA 02667

RFQ Contractor - Nauset Regional High School Project - Sub
Addition, Demolition, Infrastructure, Renovation - 214,650 SF
Sub-Bidding
$105,000,000 CJ est. value
Eastham, MA 02642

Nauset Regional High School REBID - Sub Bid
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$102,000,000 CJ est. value
Eastham, MA 02642

Water Meters and Meter Readers for Yarmouth Water Division
Term Contract
Post-Bid
$150,000 to $450,000 est. value
Yarmouth, MA 02675

Waterworks Materials
Post-Bid
$65,000 est. value
Harwich, MA

2021 WPCF Gate Valve Replacements
Results
Less than $45,000 est. value
Barnstable, MA

2021 Pump Station Improvements - General Bid
Renovation
Results
$735,000 est. value
Hyannis, MA

Camp Sippewissett Parking and Improvements
New Construction, Renovation - 7,900 SF
Construction
Falmouth, MA

The Crossings at the Canal
New Construction, Infrastructure - 26,000 SF
Pending Verification
$20,000,000 CJ est. value
Bourne, MA 02532

Main Street Apartment Development
Demolition, New Construction, Infrastructure - 7,618 SF
Pending Verification
$2,000,000 CJ est. value
Chatham, MA 02633

Trap Dock Utility Shed
Infrastructure - 756 SF
Bidding
$300,000 CJ est. value
Chatham, MA 02633

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 08/29/2022 06:33 PM
Project Title

Installation of Two New Sanitary Sewer Grinder Pump Stations Installation of One Doghouse Sewer Manhole Including Gravity Piping

Physical Address View project details and contacts
City, State (County) Bourne, MA 02532   (Barnstable County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $496,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to: installation of two new sanitary sewer grinder pump stations, installation of one doghouse sewer manhole including gravity piping, abandonment of two existing grinder pump stations & one electrical structure, and all related civil/site work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents