Similar Projects
Hurricane Laura Damages Restoration to CPSB Administration Building
Renovation
Post-Bid
Lake Charles, LA 70615

Hurricane Repairs Vinton Middle School
Renovation
Post-Bid
Vinton, LA

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

Hurricane Repairs for Calcasieu Parish School Board
Renovation
Results
Lake Charles, LA

Hurricane Laura Repairs - A.M. Barbe/SJ Welsh - Sports Fields and Building Repairs
Renovation
Post-Bid
Lake Charles, LA

WHS Modular Football Facility Setup
New Construction
Results
Westlake, LA 70669

St. Louis Catholic High School-Buildings Stabilization
New Construction
Post-Bid
Lake Charles, LA

Dequincy Area Schools Hurricane Restoration
Renovation
Results
DeQuincy, LA 70633

Phase 33 - Improvements Classroom Addition to Existing Pod
Addition
Post-Bid
Lake Charles, LA

Washington Marion High Two-Story Classroom Repairs and Exterior Repairs
Renovation
Results
$887,657 est. value
Lake Charles, LA 70615

Saint Louis Catholic High School Temporary Tension Fabric Structure - Part A
New Construction
Post-Bid
Lake Charles, LA

Starks School Repairs - Hurricane Laura Damages Restoration Project
Renovation
Results
Lake Charles, Starks, LA 70661

Saint Louis Catholic High School Temporary Tension Fabric Structure - Part B
New Construction
Post-Bid
Lake Charles, LA

Additions to Westlake High School
Addition
Results
Lake Charles, Westlake, LA 70669

Hackberry High School Restoration Phase II
New Construction
Post-Bid
$400,000 est. value
Lake Charles, LA 70607

Last Updated 06/07/2022 02:49 AM
Project Title

Grand Lake High School Miscellaneous Campus Repairs

Physical Address View project details and contacts
City, State (County) Lake Charles, LA 70607   (Calcasieu County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work located at the Grand Lake High School campus consists of replacement of damaged mechanical rooftop units, new baseball building, new softball building, new concession building, repair to bleacher covers at softball field, repair drainage on East side of high school wing, repair chain link fence in various locations throughout campus, new flag pole at baseball field, repair to elementary playground safety surface, new marquee sign at high school and elementary school entrances, interior repairs to old home economics building, flooring repairs at elementary school, rebuild walkway canopy between elementary and middle school classrooms, repair of conduit at emergency generator. 1. The Work includes all necessary labor and materials to complete the project as indicated in the Construction Documents. 2. The buildings will be occupied at the time of construction and care must be taken not to disturb normal operations. 3. Dimensions: Contractor is responsible to field verify dimensions and existing conditions. 4. Permits: Apply for, obtain, and pay for permits required to perform the work.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents