Similar Projects
Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass)
Infrastructure
Bidding
$92,192,162 CJ est. value
Linden, AL 36748

Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass)
Infrastructure
Bidding
$92,192,162 CJ est. value
Linden, AL 36748

Rehabilitation of the Asphalt Surfaces of Various Streets- Phase 2
Post-Bid
Demopolis, AL

Street Rehabilitation and Resurfacing
Post-Bid
$550,000 est. value
Demopolis, AL

Constructing the Bridge Replacements Grading, Drainage, Pavement, and Bridge
New Construction, Infrastructure
Results
$7,317,335 to $8,943,410 est. value
AL

Constructing The Plaining, Resurfacing, And Traffic Stripe On Sr-12 (Us-84) From The Intersection Of Sr-17 To 1.600 Miles East Of The Junction Of Cr-6 (Bladon Springs Road) East Of Bolinger
Infrastructure
Results
$1,733,262 to $2,118,431 est. value
AL

Choctaw County Regional Landfill Cell 3A
Infrastructure
Bidding
$500,000 CJ est. value
Toxey, AL 36915

2022 Street Resurfacing
Infrastructure
Post-Bid
$500,000 CJ est. value
Silas, AL 36919

Constructing the Safety Improvements (Roadway Lighting Installation) on Sr-8 (Us-80) at the Westrock Paper Mill Entrances
Infrastructure
Results
$612,765 to $748,935 est. value
AL

Constructing the Micro-Milling, Resurfacing Scrub Seal, and Traffic Stripe on SR-10 From 0.290 Mile West of the Junction of SR-69 to the Junction of 3rd Street
Infrastructure
Results
$2,362,413 to $2,887,394 est. value
Sweet Water, AL

Constructing the Safety Widening, Micro-milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (Us-43) From 0.800 Mile North of the Junction of CR-47
Infrastructure
Results
$1,781,913 to $2,177,893 est. value
AL

Constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (US- 43) from the Junction of 12 Link Road to the junction SR-8 (US-80) in Demopolis
Infrastructure
Results
$1,969,750 to $2,407,472 est. value
AL

Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass) from 1.140 miles south of the junction of SR-13 (US-43) and SR-69 to the Junction of SR-28 in Linden
New Construction, Infrastructure
Results
$49,214,240 to $60,150,737 est. value
AL

Last Updated 07/25/2022 02:36 PM
Project Title

Micro-Milling, Resurfacing, and Traffic Stripe on SR-10

Physical Address View project details and contacts
City, State (County) Butler, AL 36904   (Choctaw County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $3,394,141 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Choctaw, Marengo Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-10 from the junction of Ida Avenue in Butler to 0.290 mile west of the intersection of SR-69 southeast of Tompkinsville. Length 12.177 mi. The Bracket Estimate on this project is from $2,870,637 to $3,508,556 . Contract Time: 70 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., hours and Safety Standards Act and its implementing regulations. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 046 - Micro-Milling, Resurfacing, and Traffic Stripe on SR-10 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents