Similar Projects
Animal Shelter Re-Roof
Post-Bid
Harrisville, UT 84404

First Step Housing Roofing Project
Renovation
Post-Bid
Salt Lake City, UT

Corinne and Jack Sweet Library Roof Replacement
Results
Salt Lake City, UT 84103

Public Library System - Day-Riverside Branch Roof Replacement Project
Results
Salt Lake City, UT 84116

Millcreek Residential Roof Replacement
Post-Bid
Millcreek, UT

Roof Drainage Replacement - Eccles Institute of Human Genetics
Results
$20,000 to $30,000 est. value
Salt Lake City, UT 84112

Re-Roofing of Pavilion at Nielsen`s Grove Park
Post-Bid
Orem, UT 84058

Replacement of the Sand Hollow Aquatics Center Arch-Supported Tensile Fabric Roof Membrane
Results
Saint George, UT 84770

Oak City Roof Replacement
Renovation - 38,500 SF
Post-Bid
Oak City, UT

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing Contractors
Post-Bid
Saint George, UT 84770

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

North Ogden 1, 5, 21 Seismic Re-Roof
Renovation
Post-Bid
North Ogden, UT 84414

Roof Replacement and Flooring Replacement
Results
Provo, UT

Box Elder Middle School Partial Re-Roof
Post-Bid
Perry, UT 84302

Last Updated 02/17/2020 11:41 AM
Project Title

Logan District Office Roof Replacement

Physical Address View project details and contacts
City, State (County) UT   (Cache County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $50,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. This project includes all work required to rehabilitate one roof covering system owned by the Forest Service on the Uinta-Wasatch-Cache National Forest. The contractor shall provide all labor, materials, and equipment necessary to complete all the BID ITEMS as described in the contract documents. B. The work includes, but is not limited to: removal and disposal of the existing roof coverings (dispose per local jurisdiction rules), furnish and installation underlayment materials, sheet metal flashing and trim to match existing color (Forest Service brown), new vent collars, and roof coverings (architectural asphalt shingles). Shingles shall be per the specifications. The more stringent of the manufactures’ installation instructions and specifications herein are required. Measurement of the roof components and quantities shall be the responsibility of the contractor. C. The Logan District Office roof area is approximately 4,754 SF with a 5:12 pitch hipped roof. D. This project is to be constructed while the building is occupied by the user. Coordination and phasing of work the COR is required. Staging and storage of materials are to be coordinated with the COR prior to the start of the project. Damages to any portion of the building while this project is completed are to be repaired with matching finishes of what is now installed. Clean out any debris that falls into the landscaping.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents