Similar Projects
Alachua County School Board / 143rd St
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Gainesville, FL 32606

Northwest Highway 320 Infrastructure Surtax - STC073884 - Marion County
Infrastructure
Conception
$1,410,240 CJ est. value
Micanopy, FL 32667

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

RFP D/B - SR 26 from Oaks Mall to SE 9th Street
Infrastructure
Post-Bid
$2,439,894 CJ est. value
Gainesville, FL 32607

General Contractor Services for Cuscowilla Maintenance and Accessibility Improvements
New Construction
Results
$750,000 est. value
Micanopy, FL 32667

SR 26 - Milling and Resurfacing, Traffic Signals, Drainage Improvements and Lighting
Infrastructure
Results
$1,474,700 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Discovery Village Senior Living - Celebration Pointe
New Construction, Infrastructure - 116,843 SF
Construction
$50,000,000 CJ est. value
Gainesville, FL 32608

Sonic at SW Archer Road / Gainesville
New Construction, Infrastructure - 4,920 SF
Pending Verification
$1,000,000 CJ est. value
Gainesville, FL 32608

Park Lane Planned Development Phase IIA
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Gainesville, FL 32608

Ray's Metal Works Addition
Addition, Demolition, Infrastructure - 2,550 SF
Design
$600,000 CJ est. value
Alachua, FL 32615

Gainesville Regional Airport General Aviation Apron Rehabilitation
Infrastructure
Post-Bid
$450,000 CJ est. value
Gainesville, FL 32609

Southwest 4th Avenue Sidewalk Project
Infrastructure
Results
Newberry, FL 32669

Last Updated 07/13/2023 12:23 PM
Project Title

Construction of Lincoln Yard Trail

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32601   (Alachua County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project, of which the Work under the Contract Documents is a part, is generally described as follows: The Lincoln Yard Trail project is a new linear park that will be constructed on the east side of the Lincoln Estates Neighborhood, spanning from SE 10th Place to SE 8th Avenue within city-owned property, parcels 16107-000-000 and 16085-000-000. The approximate address of the northern project limit is 2100 SE 8th Avenue. The project includes the installation of an aggregate pathway, fencing, hardscape, a small playground, adult fitness equipment, trash/recycling receptacles, decorative entrance features and landscaping. This summary is merely a highlight of the project's scope of work and is not intended to be a comprehensive list of tasks to be performed, which can be found in the plans and specifications. General Contractor's License OR Building Contractor's License Bidder agrees that the Work will be substantially complete within 180 calendar days after the date when the Contract Times commence to run as provided. Liquidated Damages Rate (from Agreement): $250/day Question Deadline 07/28/2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents