Similar Projects
Stormwater Pond Bulkhead Improvements
Post-Bid
FL

Culvert Pipe Replacement Emerson Drive at Canal C-51
Post-Bid
Less than $455,665 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement - Units 23 and 56
Results
Less than $667,000 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement - Unit 18
Results
Less than $225,000 est. value
Palm Bay, FL 32907

Orange Street Drainage Improvements
Post-Bid
Melbourne Beach, FL 32951

Baseflow Basin Project
Results
Melbourne, FL 32940

Drainage Repair
Results
Less than $400,000 est. value

R and R Intermediate Bridge
Results
Less than $1,417,414 est. value
FL

R and R Minor Bridge
Results
Less than $153,006 est. value
FL

B-5 2nd Avenue / Riverside Drive Off-Line Retention Area
Results
$136,985 est. value
Indialantic, FL

Fabric Formed Revetment Installation Services
Term Contract
Results
$100,000 est. value
Melbourne, FL 32901

Culvert Pipe Replacement – Waterbury Avenue at C-39 and Freehold Avenue at C-41R
Results
Less than $821,320 est. value
Palm Bay, FL 32907

Oceana Beach Access Dune Crossover
Results
$28,876 est. value
Satellite Beach, FL 32937

Lift Station F04 Seawall Replacement
Results
$45,000 est. value
Merritt Island, FL 32940

Culvert Pipe Replacement - Units 24 and 25
Results
Less than $1,295,000 est. value
Palm Bay, FL 32907

Last Updated 04/02/2020 11:16 AM
Project Title

Culvert Pipe Replacement - Jacobin @ C-60

Physical Address View project details and contacts
City, State (County) Palm Bay, FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the removal of failed culvert structures and installation of replacement structures at Jacobin Street and MTWCD canal C-60. Construction of this project is all turn-key and will include all aspects of work including but not limited to: furnishing and installing all items, removal of existing failed culvert(s), furnish and installation of 80’-10’ x 6’ box culverts and endwall at the location, and furnishing and installing all associated materials items per specifications and providing needed staff, equipment, labor, to complete the construction per plans and specification. Work shall include items such as maintenance of traffic, mobilization, erosion control, clearing and grubbing, excavation, dewatering, demolition, de-mucking, disposal of unusable materials, new fill, base rock under pipe and roadway, compaction of fill, stabilization, testing, restoration of road including pavement installation, procurement furnish and installation of selected structures, utility valve installation and conflict coordination and relocations, final clean up, sodding of disturbed areas, temporary and final thermoplastic striping, signed and sealed as-built plans, maintenance of traffic notification, home owner notifications, permits preparation and submittal and permit notification of start, permit compliance and permit closure as applicable as per the provided construction plans, bid documents and specifications provided. No additional compensation shall be provided for the work specified in the plans, bid documents, scope and specification provided herein. All work specified in the plans, bid documents, scope and specifications shall be cost out with the line items provided.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents