Similar Projects
Renovations and Additions to Pollock Elementary
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Pollock, LA 71467

Hangar Development and Access Improvements Phase II
Infrastructure
Bidding
$1,560,000 CJ est. value
Gonzales, LA 70737

Concrete - DOC-RLCC
Term Contract
Sub-Bidding
Baton Rouge, LA 70802

Storage Tank and Containment Zone Demolition and Site Improvements
Demolition, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Reserve, LA 70084

Concrete for CRT
Alteration
Post-Bid
Lake Charles, LA 70611

Greek Plots
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
New Orleans, LA 70122

City-Wide Concrete Street Rehabilitation 2021 Phase 1
Alteration
Results
Lafayette, LA

Valencia Spray Park
New Construction, Infrastructure
Results
$198,500 CJ est. value
Shreveport, LA 71101

3" Concrete Coring to Install Termite Bait Stations
Alteration
Post-Bid
New Orleans, LA

Burial Vaults for LDVA
Alteration
Results
Keithville, Leesville, Rayville, Slidell, LA 71047

Webster Parish Health Unit Building Upgrades
Renovation
Post-Bid
$220,000 CJ est. value
Minden, LA 71055

On-Demand Concrete Repairs for Public Works
Alteration
Results
$900,000 est. value
Bossier City, LA 71111

Ready Mix Concrete
Alteration
Post-Bid
Alexandria, LA

Campus-Wide Concrete Repairs
Term Contract
Results
Lafayette, LA

Spun Prestressed Wood Pole Equivalent Concrete Poles
Term Contract
Post-Bid
Alexandria, LA

Last Updated 07/07/2023 02:03 PM
Project Title

C.C. Antoine Park Improvements

Physical Address View project details and contacts
City, State (County) Shreveport, LA 71107   (Caddo County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,780,345 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

C. C. Antoine Park Expansion Designer's Estimate: $2,435,462.00 performance bond equal to 100% of the amount of the contract and a 50% payment bond and 10% two-year maintenance bond Location- The work of this Contract is located north of Abbie Street and south of Anna Street, between Sycamore and Bossieau. SCOPE OF WORK A. Furnish all labor, materials, equipment, appurtenances, supplies and incidentals required to construct site improvements, including, but not limited to, demolition, clearing, subgrade preparation, retaining walls, reinforced concrete playground equipment, curbs, gutters, drives, potable water service, sewer service, restroom, pavilion, spray park, and related work as shown on the Drawings and as specified herein. The scope of this project is to construct an expansion of the existing C.C. Antoine Park Improvements. The park construction will include earthwork, electrical, plumbing, landscaping, masonry, concrete, spray park furnishing and installation, restroom construction and various trades as they relate to recreational park and greenspace construction. Q & A deadline: Jun 22, 2023 3:00:00 PM EDT EMAIL QUESTIONS TO: dereka.abner-mims@shreveportla.gov

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents