Similar Projects
Last Updated | 11/17/2022 02:05 AM |
Project Title | Robert T. Savely Water Reclamation Facility Air Header Replacement |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77058 (Harris County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $673,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A.The work in this contract is for the Robert T. Savely Water Reclamation Facility Air Header Replacement for the Clear Lake City Water Authority (CLCWA) located at the corner of Middlebrook Drive and Space Center Boulevard in Harris County, Texas. Contractor shall construct and put into operation, as acceptable to Owner, all portions of the work as shown in the Contract Documents. The existing air header piping at the Robert T. Savely Water Reclamation Facility was installed as part of an emergency repair and the improvements included in this contract are intended to make the emergency repair permanent. B. In general, this work consists of: The removal of existing air header piping, valves, fittings and appurtenances as required for installation of the proposed work. Installation of 12-inch Victaulic style 231s thermal expansion coupling, including removal and replacement of 10S steel air piping as required for installation. Installation of three (3) 18-Inch Victaulic style 231s thermal expansion coupling, including removal and replacement of existing 10S steel air piping as required for installation. Installation of 20-Inch Victaulic style 231s thermal expansion couplings, including removal and replacement of existing 10S steel air piping as required for installation. Installation of four (4) 24-inch Victaulic style 231s thermal couplings, including removal and replacement of existing 10S steel air piping as required for installation. Removal and disposal of existing 12" PVC plant drain and 48" concrete manholes as shown on drawings and required for installation of concrete pipe supports. Installation of 16-inch ductile iron air header piping, including fittings, as shown on drawings. Installation of concrete pipe supports for steel air header piping including steel pipe supports. Site restoration and regrading of site for positive drainage, including removing and replacing concrete sidewalks and driveways, damaged turf, plants, shrubs, fences and trees as required. The Owner reserves the right to waive any informalities or minor defects and to reject any or all bids. In case of the lack of clarity or ambiguity in prices, the Owner reserves the right to accept the most advantageous or reject the bid. The successful bidder will be required to provide payment and performance bonds in the amount of one hundred percent (100%) of the contract price Each bid shall be submitted on the prescribed form and accompanied by a bid bond, cashier's check or certified check in the amount equal to ten percent (10%) of total base bid. If certified or cashier's check is used as bid security, check must be drawn on a responsible bank located in the State of Texas and made payable to Owner only. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |