Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Contractors
Term Contract
Post-Bid

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

HVAC and Filter Maintenance
Term Contract
Results
Charleston, SC

Materials For Weatherization Assistance Program
Term Contract
Post-Bid

Arco Lane Warehouse Chiller Replacement
Alteration
Results
$150,000 to $175,000 est. value
North Charleston, SC 29418

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Installation of Vav Fume Hood
Term Contract
Results
Charleston, SC 29412

Heat Pump System 7.5 ton Charleston SC
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Charleston, SC 29412

UHE Air Handler 3 Replacement
Alteration
Results
$523,085 est. value
Charleston, SC

Variable Frequency Drives for Existing Air Handler-Charleston, SC
Term Contract
Post-Bid
SC 29414

Palmer Campus Building 8100 Rooftop HVAC Replacement 2021
Alteration
Results
Charleston, SC 29403

Basic Science Building Air Handler 1 (West Side) Replacement
Alteration
Post-Bid
$4,300,000 to $4,400,000 est. value
SC 29425

SC DNR Maintenance and Repair on Small Refrigeration Systems
Term Contract
Results
Charleston, SC 29412

Charleston Dorchester MHC`s HVAC Maintenance
Term Contract, Alteration
Post-Bid
Charleston, Summerville, SC 29414

Last Updated 09/26/2022 12:05 PM
Project Title

Removal and Reinstallation of Fume Hoods (Including Electrical)

Physical Address View project details and contacts
City, State (County) Charleston, SC 29412   (Charleston County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 7/11/2022, no bids received. Project may rebid with revised specifications at a later date. Please read the solicitation for Removal and Reinstallation of Fume Hoods (including electrical) in Charleston SC, carefully before responding.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents