Similar Projects
Last Updated | 10/23/2019 08:39 AM |
Project Title | J--Semi-Annual Ice Machine Maintenance, Cleaning, and Sanitation of Ice Machines |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA 19104 (Philadelphia County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide Semi-Annual (every July and January of each year) Maintenance, cleaning, and sanitizing of 25 ice machines. Provide labor and material necessary to clean and sanitize ice machine units as follows: - The contractor shall lock out tag out the ICE machine before cleaning. All work shall be coordinated with A/C foreman at 215-823-5103. - The contractor shall provide semiannual cleaning and sanitization for 27 ice machines that are in different locations and off campus in outpatient clinics. - The contractor shall change the filters on each machine, filters will be provided by the VA , AC shop at 215-823-5103. - The contractor shall Vacuum clean condenser fins. - The contractor shall vacuum clean, sanitize and wash media filters. - The contractor vacuum and clean auger exterior and insulator. - The contractor shall clean the reservoir, drain the condensate water , clean the evaporator interior, clean evaporator exterior, clean side panels and all ice machine components. - The contractor shall remove scale ( rust) from reservoir, evaporator, hopper, wheel, lid, ice dispenser chute and drain area. - The contractor shall sanitize reservoir, evaporator, hopper, wheel, lid , ice dispenser chute and drain pan area. - The contractor shall check drain lines for leaks, remove any drain pipe oxidizations and clean all machine drains. - The contractor shall reassemble the ice machine dispenser components, and test for operation. - The contractor shall replace any missing screws and broken door clips. - The contractor shall provide start -up , cycle machine , make ice and verify the ice machine operation. - The contractor shall provide certification of sanitization and two detailed report of joint commission compliance. - The contractor shall provide ozone friendly chemicals , personal protective equipment’s and file daily report to the A/C shop foreman. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |