Similar Projects
8,800 Gallons Galvanized Livestock Storage Tanks
Bidding
Aguila, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Water System Improvements
Results
$25,000 to $100,000 est. value
Flagstaff, AZ 86001

Wupa - Upgrade Water System Controls
Results
$25,000 to $100,000 est. value
Flagstaff, AZ

Water Tank Rehabilitation Project
Post-Bid
Snowflake, AZ 85937

Inspect Clean Water Storage Tanks
Results
Glendale, AZ 85309

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

J--GLCA - WAHWEAP Decon System Upgrade
Results
Page, AZ 86040

Underground Storage Tank Removal
Results
$25,000 to $100,000 est. value
Tucson, AZ 85707

US EPA Tribal Nation Underground Storage Tank Program Support
Results

Summit 2 Water Tank
Results
$3,000,000 to $4,000,000 est. value
Prescott Valley, AZ 86314

Elevated Water Storage Reservoir, Piping and Appurtenances
Results
Winslow, AZ

Winy Hill Dump Station with Water Tower, and a new Water Fill Station
Results
Roosevelt, AZ 85545

H379--Clean & Inspect Potable Water Tank
Results
Tucson, AZ 85723

Reported 12/30/2020 12:00 AM
Project Title

New 300,000 Gallon Water Storage Tank at Well No. 4 Project

Physical Address View project details and contacts
City, State (County) Snowflake, AZ   (Navajo County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site preparation and grading for a new 300,000-gallon water storage tank. The work includes fabrication and erection of the water tank as well as tank painting, disinfection, and connections to existing yard piping.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents