Similar Projects
Salamanca CSD Improvements - Phase 3.3 and 3.4
Design
Salamanca, NY 14779

Pine Bush CSD 2019 Capital Improvement Project Phase 2
Bidding
Circleville, Pine Bush, NY 10919

Berlin Central School District Capital Improvement Project
Renovation
Bidding
Berlin, Cherry Plain, NY 12022

2018-2019 Capital Outlay Project Arlington High School Partial Reconstruction to UV Controls
Renovation
Post-Bid
Lagrangeville, NY 12540

Site Work, Window Replacement, Interior Renovations, Related Work at School 17
Post-Bid
Yonkers, NY 10704

Beaver Street High School Addition and Renovations Phase1
Results
Albany, NY

SPRY Middle School and Buildings and Grounds
Results
Webster, NY 14580

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Port Chester Middle School Windows and Select Facade Replacement, Abatement, HV Upgrades, Bridge Renovations and Related Work
Construction
Port Chester, NY 10573

Ravena-Coeymans-Selkirk CSD - District Wide Renovations Phase 3
Renovation
Bidding
Coeymans, Selkirk, NY 12143

North Colonie CSD - 2017 Capital Project
Renovation, Addition
Post-Bid
Latham, NY 12110

Sherburne-Earlville C.S.D Reconstruction at Sherburne - Earlville ES and MS Bus Maintenance Bus Storage
Results
Less than $4,400,000 est. value
Sherburne, NY

Elmira City School District High School 2019 Alterations
Renovation
Construction
Elmira, NY 14900

Cafeteria and 3rd Floor Emergency Egress Improvements at Siragusa - School 14
Renovation
Bidding
Yonkers, NY 10704

Salamanca CSD 2019 Main Campus Alterations
Post-Bid
Less than $1,945,000 est. value
Salamanca, NY 14779

Last Updated 01/11/2021 09:37 AM
Project Title

Reconstruction and Alterations at High School East

Physical Address View project details and contacts
City, State (County) Clifton Park, NY 12065   (Saratoga County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced second quarter 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $8,887,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Construction - $5,750,000 Plumbing - $642,000 HVAC - $1,601,000 Electrical - $894,000 The work includes reconstruction of existing science and technology rooms, including reconfiguration of technology wing. General Construction: Hazardous material abatement, Various types of flooring, Ceiling work, Roofing, Structural steel, Masonry work, Hollow metal door and hardware, overhead doors, Metal stud/gypsum work, Painting, Acoustical ceilings. Plumbing: New natural gas infrastructure to science rooms, science lab room reconstruction and technology including sinks, acid waste pipe and venting. Mechanical: Replacing HVAC units in science and technology rooms, dust collector system. Electrical: Reconstruction work in science and technology rooms, including fire alarm work, lighting, electrical panel work, wiring, camera, cabling.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents