Similar Projects
Last Updated | 10/07/2023 06:05 PM |
Project Title | HVAC Controls Replacement - John C Burke Correction Center |
Physical Address | View project details and contacts |
City, State (County) | Waupun, WI 53963 (Dodge County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $165,000 [brand] Estimate |
Plans Available from | Mechanical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For HVAC Controls Replacement - Burke Correction Center In general the work consists of: Replacing the existing air handling units and heat exchanger pneumatic controls with new DDC controls and a Niagara N4 Jace 8000 supervisor. This is a 2 story Department of Corrections Building with 3 inmate wings and a central core and support / common areas. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703 Contract offer and construction phase records will be processed electronically on the WisBuil DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws.55 Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. Contractor shall submit the "Facility Security Clearance Background Check" AND "DOC-2786 PREA Sexual Abuse and Sexual Harassment in Confinement Training Contractor Statement of Acknowledgment" forms no later than 24 hours prior to the pre-bid tour to arrange for clearance onto the institution grounds of all contractor personnel that will attend the meeting. Contractor shall email the form to Zach Blair, Ken Feavel, and Adam Duel. Zach Blair: zacharyp.blair@wisconsin.gov, 608-240-5376 Ken Feavel: kenneth.feavel@wisconsin.gov Adam Duel: adam.duel@wisconsin.gov, 920-324-6594. Please contact Grumman|Butkus Associates, Paul Noetzel, 414-476-8980, pnoetzel@grummanbutkus.com for additional information. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |