Similar Projects
Sidewalk Connection - Town of Montverde
Infrastructure
Conception
$305,000 CJ est. value
Montverde, FL 34756

Sidewalk Connection - Town of Montverde
Infrastructure
Conception
$305,000 CJ est. value
Montverde, FL 34756

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Public Works Operations Center
Infrastructure
Bidding
$2,200,000 CJ est. value
Tavares, FL 32778

7-Eleven #42219 / Eustis
New Construction, Infrastructure - 5,254 SF
Post-Bid
$900,000 CJ est. value
Eustis, FL 32736

Sara Maude Mason Boardwalk Cleaning Project
Infrastructure
Post-Bid
Howey-in-the-Hills, FL 34737

CR 42 Lane Departure Mitigation for Marion County Line to SR 44
Results
$1,138,017 est. value
FL

Dead River Road at State Road 19 Intersection Improvements
Infrastructure, Alteration
Results
$612,000 est. value
Tavares, FL 32778

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Victory Village Market
New Construction, Infrastructure - 7,816 SF
Construction
$6,000,000 CJ est. value
Clermont, FL 34711

Turnpike Logistics Center
New Construction, Infrastructure - 977,000 SF
Pending Verification
$63,500,000 CJ est. value
Groveland, FL 34736

Auto Plex Lane Dealership
New Construction, Infrastructure - 61,000 SF
Pending Verification
$16,000,000 CJ est. value
Clermont, FL 34711

Mount Dora Groves South
New Construction, Infrastructure - 150,000 SF
Conception
$346,000,000 CJ est. value
Mount Dora, FL 32757

Last Updated 12/02/2022 07:04 AM
Project Title

Sidewalk/Clearing and Grubbing/Removal of Existing Concrete (BDI)

Physical Address View project details and contacts
City, State (County) Umatilla, FL 32784   (Lake County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,068,776 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: MARION Road Name: SR 40 Limits: FROM NW 27TH AVE TO SW 7TH AVE Project(s): 43759625201(*) Federal Aid No: D521094B Total Roadway Length: 1.406 Miles Contract Days: 190 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.406 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Calendar Days Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 010 - Sidewalk/Clearing and Grubbing/Removal of Existing Concrete (BDI)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents