Similar Projects
D/B - Replace Water Storage Tanks for Fire Suppression System
Infrastructure
Bidding
$100,000 to $250,000 est. value
Sierra Vista, AZ 85613

Livestock Storage Tanks
Post-Bid
Aguila, AZ

Hospital Hill Tank Renovation
Post-Bid
Hayden, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Tank Inspection, Repair, and Coating
Alteration
Post-Bid
Glendale, AZ

H379--Clean & Inspect Potable Water Tank
Results
Tucson, AZ 85723

Cactus Forest Water Distribution System Replacement
Infrastructure
Post-Bid
AZ

Water Storage Tanks Cleaning, Inspections and Repairs
Results
$250,000 to $500,000 est. value
Sells, AZ

Welded Steel Water Tank
Infrastructure
Post-Bid
Cottonwood, AZ

Pefo Replace Water Tank Ladder
Results

Bolted Steel Water Tank
Infrastructure
Post-Bid
Cottonwood, AZ

Demolition of Existing Steel Water Storage Tank
Results
Canyon Day, AZ - Albuquerque, NM 85941

Cathodic Protection Maintenance
Term Contract
Post-Bid
Peoria, AZ

Tank N-2A-07
Results
$1,922,636 est. value
Lake Havasu City, AZ

Reported 06/16/2022 03:49 PM
Project Title

Oasis Water Treatment Plant Improvements - CIPWA61055 - City of Glendale

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85303   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a water / sewer project in Glendale, Arizona. Conceptual plans call for the renovation of a water / sewer project. Evaluation of groundwater plant condition, construction of efficiency and operation upgrades. Brine ponds improvements in future years. As of June 15, 2022, this project is currently in the FY 2022-2031 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents