Similar Projects
P-1049, Design-Build, Wallops Island Power Quality Upgrade at JEBLCFS Wallops Island, VA
Post-Bid
$10,000,000 to $25,000,000 est. value
Wallops Island, VA

Repairs, Rewinding, and Replacement of Electric Motor
Term Contract
Post-Bid
Alexandria, VA

Led Lighting Phase II
Results
$168,008 est. value
Manassas, VA

Conmy Hall Lighting and Audio Upgrade
Results
Arlington, VA 22211

Meadowlark's Winter Walk of Lights Installation and Takedown
Term Contract
Post-Bid
Vienna, VA 22182

62--VACO Studio Lighting Upgrade - B/V (VA-19-00054421)
Results
Arlington, VA 22202

Self-Powered Overcurrent Relays, National Airport
Post-Bid
Dulles, VA 20166

Solar PV System Maintenance, Monitoring and Software Services
Results
Arlington, VA 22201

TRADOC Uninterruptible Power Supply Repair and Maintenance
Post-Bid
Fort Eustis, VA

Roanoke Regional WPCP Electrical Upgrades
Results
Roanoke, VA 24014

Uninterruptible Power Supply Maintenance and Repair
Term Contract
Post-Bid
Chester, Midlothian, VA

UPS Battery Installation
Results
Portsmouth, VA 23701

Various Pad Mounted Transformers
Post-Bid
Manassas, VA 20110

Solar Aquatic Aeration System Including Bubblers
Results
VA

On-Demand Electrical Maintenance and Repairs
Term Contract
Post-Bid
Christiansburg, VA 24073

Reported 05/27/2021 12:00 AM
Project Title

Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure

Physical Address View project details and contacts
City, State (County) Wallops Island, VA   (Accomack County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Restoration of Main Base Electrical Infrastructure - Project will replace approximately 40,000 linear feet (6.6 miles) of direct burial cable with a new electrical power feeder in conduit using directional boring technology. The work will also include replacing approximately 36 live front air switches throughout the Main Base with more reliable and safer SF6 gas switches. In addition, redundant feeders and looped circuits will be created as part of this project to allow for more flexibility and resiliency during power outages and system maintenance. In order to create the looped circuits the last remaining portion of the old 2400V system that serves the airfield will require upgrading to a 12,470 V, 3-Wire system. This includes replacing all direct burial cables, sectionalized switches, transformers, and other related equipment that make up the 2400 V system. The existing backbone feeder throughout the Main Base is 15 kV, 4/0 AWG copper with the exception of a few sections of the system. These remaining portions shall be replaced with 4/0 AWG feeders.

Details

Division 26 - Electrical, Common Work Results for Electrical, Cable Trays for Electrical Systems.
Division 27 - Communications, Communications Backbone Cabling.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents