Reported | 06/04/2022 12:00 AM |
Project Title | Capital Gallery Fit Up Administrative Headquarters 3rd Floor East |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20024 (District of Columbia County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Museum |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Tenant Fit Up of approximately 35,000 square feet of existing 3rd floor Office Suite with limited demolition; partition modifications; new ceiling tile, wall, and floor finishes; miscellaneous cabinetry. o Remodeling of the South and North Male and Female Toilet Rooms for ADA compliance with new fixtures and finishes and associated plumbing. o Demolition of plumbing fixtures and piping in existing pantries and addition of new plumbing fixtures and piping in two new pantries and mother's room o Remodeling of the South and North LAN Rooms with new Communication and Security equipment. o Limited HVAC alterations and addition of three new ceiling units; one new unit per LAN Rom and one conference room unit. o Modification to HVAC controls for central AHU's and floor-mounted perimeter units. o Limited Electrical alterations and additions of power, mechanical equipment, and lighting branch circuits; o new lighting fixtures and lighting control system and devices; replacement and consolidation of existing panelboards; new power and ground bus in LAN room. o Fire Alarm - Modify existing fire alarm system to meet new tenant fit-out and NFPA 72 codes for audibility. Installation of smoke detection throughout public and common areas. Sprinkler - Providing all new quick response heads throughout and modifying existing sprinkler system to meet new tenant fit-out. All work is to be completed by December 12, 2022. To reduce the possibility that a balance report is rejected, we suggest the Test Adjust Balance Contractor submit a sample report in advance of its work for Boston Properties' approval. |
||||||||||||||||||||||||||||||||||||||||
Details | Museum, Renovation.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |