Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

Ally Life Science Building
New Construction - 320,000 SF
Design
$10,000,000 est. value
Chicago, IL 60614

Life Science Laboratory Office Development
New Construction - 1,035,750 SF
Design
$218,000,000 est. value
Chicago, IL 60642

FY2021 BPA Contract - APS Site Operations
Post-Bid
Lemont, IL 60439

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

ICR - Ceiling Replacement at Roberto Clemente Community Academy High School
Results
Chicago, IL 60622

Argo G Bldg Second Floor Toilet Renovation
Renovation
Results
Summit, IL 60501

Argonne National Laboratory Long Beamline Building Laboratory
New Construction - 23,000 SF
Construction
Lemont, IL 60439

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Illinois Molecular Facility
New Construction - 50,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Skokie, IL

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Secure Vestibule Renovations at Multiple Sites
Renovation
Results
Elk Grove Village, IL 60007

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Last Updated 03/04/2022 01:20 AM
Project Title

Streamwood HS Pathway

Physical Address View project details and contacts
City, State (County) Streamwood, IL 60107   (Cook County)
Category(s) Education, Laboratory
Sub-Category(s) Laboratory, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to: Major renovation work at First Floor ‘C` Wing and ‘D` Wing, Second Floor ‘C` and ‘D` Wing, and Third Floor ‘C` Wing at Streamwood High School. Renovations to create new ‘Pathways` programs which include Business Incubator, Early Childhood, Healthcare Sciences and also includes major renovation work of the Second Floor Science Labs as shown on the drawings and described herein. All demolition, architectural, mechanical, electrical and plumbing work

Details

Middle/Senior High School, Renovation, Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents