Similar Projects
East Headworks - Heating Ventilating and Air Conditioning HVAC
Bidding
Pittsburgh, PA

Silverliner V HVAC Units
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

H--Boiler and Chiller Water Treatment Services Pittsburgh VAMC
Post-Bid
Pittsburgh, PA 15420

A251-0935, HVAC Installation Lunch Room and Garage Office
Results
Less than $99,999 est. value
PA

20 Ton A/C Unit - Coil and Condensing Unit
Results
Less than $31,600 est. value
New Castle, PA 16102

Lower Allen Commons Retail Center - Mechanical (HVAC/Plumbing
Bidding
Camp Hill, Lower Allen, PA 17011

City Hall HVAC System Preventative Maintenance Services
Post-Bid
Philadelphia, PA 19107

Elevator Space Conditioning (HVAC)
Results
Less than $170,000 est. value
Pittsburgh, PA 15212

NAVFAC Building 2B HVAC Replacement
Bidding
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19111

HVAC Replacement Project
Renovation
Post-Bid
Sciota, PA 18354

Provide a Comprehensive Heating-Ventilation-Air Conditioning HVAC Maintenance and Repair Program for the Beaver County Courthouse
Results
Beaver, PA 15009

Gateway Middle School - Additions & Renovations (HVAC Construction)
Bidding
Monroeville, PA 15146

Acquity Uplc H-Class System Air Management Services
Post-Bid
Philadelphia, PA

HVAC Renovations - HVAC Construction
Results
Wexford, PA 15090

Last Updated 10/09/2020 09:33 AM
Project Title

Wastewater Treatment Plant Upgrades Project - HVAC

Physical Address View project details and contacts
City, State (County) New Castle, PA 16101   (Lawrence County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $890,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the renovation of the existing headworks, primary clarifiers, final clarifiers, return activated sludge system, and anerobic digesters along with the construction an anoxic tank and a new wet weather treatment facility. The Project will consist of four separate prime Contracts and are identified as follows: Contract No. 20-1 General/Mechanical Work Contract No. 20-2 Electrical Work Contract No. 20-3 HVAC Contract No. 20-4 Plumbing

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents