Similar Projects
Pond and Drainage System Construction
Bidding
De Pere, WI

Flooding Repairs - Waisman Center
Bidding
Less than $136,000 est. value
Madison, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Approach Channel Entry and Rescue Upgrades
Bidding
Milwaukee, WI

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

River Bend Park Improvements
Bidding
Grafton, WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Lakeview Drive and Beach Drive Ditch Reconstruction Project
Bidding
Lake Ripley, WI 53523

2021 Culvert Pipes
Post-Bid
WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Reported 01/21/2021 12:00 AM
Project Title

2021 Gramling Lane Culvert Replacement

Physical Address View project details and contacts
City, State (County) Dousman, WI 53118   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes, but shall not be limited to, the removal of two 45 linear feet, 57" x 38" corrugated metal culvert pipes, one 45 linear feet, 36" corrugated metal culvert pipe and stone endwalls, temporary creek diversion, installation of 46 linear feet, 72" x 113" HERCP, two precast concrete end walls, removal of approximately 390 SY of asphaltic pavement, approximately 75 tons of asphaltic concrete binder course, approximately 40 tons of asphaltic concrete surface course, traffic control, full depth saw cutting, steel plate beam guard removal and installation, dewatering, erosion and sediment control measures, restoration, and final cleaning. The project also includes 4 mandatory alternates related to an increased length of road reconstruction, bridge rehabilitation at two bridges within the town limits, and precast end walls for the replacement culverts.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents