Similar Projects
Riverfront Community Center Cooling Tower Replacement
Alteration
Bidding
Leavenworth, KS 66048

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Replacement of HVAC Equipment at the East Lawrence Recreations Center, Kaw River Waste Water Treatment Plant and Fire Medical Station 2
Alteration
Results
Lawrence, KS

Replacement of Vav Boxes in Administration Building Phase II
Alteration
Results
Less than $128,000 est. value
KS

Headworks Make-Up Air Unit Replacement HVAC Improvements
Post-Bid
McPherson, KS

FOSC - Move Heat Pump Unit
Term Contract
Results
$25,000 to $100,000 est. value
Fort Scott, KS 66701

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

FOLS- Replace Chiller Tower
Term Contract
Results
Larned, KS 67550

Preventative Service Maintenance and Inspection of Commercial Chillers, Boilers and Pumps
Term Contract, Alteration
Post-Bid
Wichita, KS

Gas Turbine Cooling System Project
Alteration
Results
Gardner, KS

Air Conditioning and Furnace Filters
Alteration
Post-Bid
Wichita, KS

NWS-CR Geothermal Heating, Ventilation, and Air-Conditioning Conversions
Term Contract
Results
$500,000 to $1,000,000 est. value
Lincoln, IL - Indianapolis, Syracuse, IN - Goodland, Wichita, KS - Jackson, KY - Grand Rapids, Marquette, MI - Duluth, MN - Pleasant Hill, MO - Bismarck, Grand Forks, ND - Hastings, NE - Aberdeen, SD - La Crosse, WI

Heating, Ventilation, and Air Conditioning - HVAC On-Call Services
Alteration
Post-Bid
Wichita, KS

Replace HVAC Units at the Meadowlark and Sunflower Heights Complexes
Alteration
Results
Halstead, KS

Reported 02/15/2022 12:00 AM
Project Title

Z--BRVB - Monroe School HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace 13 air handling units at the end of Life Cycle. The 13 air handling units that serve 13 zones within the Brown v Board of Education NHS Monroe School Building were installed in 2002. This is a geothermal system. In 2023 the units will be at the end of their life cycle and should be replaced with updated more energy efficient air handling units. Currently the units are serviced quarterly by an outside firm. The units have needed various repairs to maintain them in proper working order. The predicated repairs including component replacements of the units and the cost involved for repairs will reach the cost for replacement on most units. Twelve (12) of the units are in the attic within 2 mechanical rooms. In order to remove and install these units they will need to be brought in and out through the roof at a previous access area. This will involve removal and repairing the roof EDPM and access material. The existing units are monitored via a Johnson control panel located in the basement. As part of this scope, the contractor shall disconnect, reconnect, and test that the panel is operational.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents