Similar Projects
Marlboro Road Culvert Replacement
Infrastructure
Bidding
$360,000 est. value
Sudbury, MA 01776

1,400 Linear Feet of Retaining Wall Blocks
Post-Bid
Hudson, MA

2021 Drainage Structure Cleaning Project
Term Contract
Post-Bid
$165,000 est. value
Watertown, MA

Drilling IDIQ in Massachusetts and Rhode Island
Results

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $2,022,520 est. value

Supply Custom Concrete Culvert and Drainage Structures to Town Contractor
Infrastructure
Post-Bid
Lexington, MA

Market Street Daylighting Project
Results
$1,200,000 est. value
Everett, MA 02149

Pre-Cast Drainage Structures
Infrastructure
Post-Bid
Lexington, MA

Elm Street Drainage Improvements Project
Results
North Reading, MA

Drainage Structure Cleaning
Infrastructure
Post-Bid
$70,000 est. value
Winchester, MA

Scheduled and Emergency Cleaning, Inspection, and Repairs of Water Quality Control Structures (WQCS) in the I-90 and I-93 Tunnels
Results
Less than $734,644 est. value

Wastewater and Drainage Materials for Construction
Infrastructure
Post-Bid
Framingham, MA

Dana Court 200-3 16 Sewer Pipe Drains Replacement Project
Results
$13,938 est. value
Waltham, MA 02453

Drainage Work at the Pine Meadows Golf Course Clubhouse
Infrastructure
Post-Bid
$100,000 est. value
Lexington, MA 02421

Scheduled and Emergency Catch Basin and Pipe Cleaning at Various Locations (Excluding the Islands)
Results
$850,000 est. value

Reported 03/25/2022 12:00 AM
Project Title

Valleyfield Grassland and Waltham Street Drainage Improvement

Physical Address View project details and contacts
City, State (County) Lexington, MA 02421   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The storm drain improvements and culvert replacement are located on Valleyfield Street, Grassland Street, and Waltham Street near Brookside Avenue.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents