Similar Projects
On-Call Snow Hauling Services
Infrastructure
Bidding
$100,000 est. value
Newton, MA

Disposal of Sewer Grit
Term Contract
Post-Bid
Somerville, MA 02143

Sources Sought Announcement on Behalf of the Government for a Follow on Effort in Regards to the Services of Solid Waste Management at Hanscom AFB
Post-Bid
Hanscom A F B, MA 01731

Refuse & Recycling at Ayer, MA
Results
$85,320 est. value
Devens, MA 01434

Hazardous Tree Removal and Trimming
Results
Concord, MA 01742

Catch Basin Cleaning Transportation and Disposal
Term Contract
Post-Bid
Waltham, MA

Hazardous Tree, Limb Removal and Stump Grinding S
Results
Concord, Lexington, Lincoln, MA

2020 Disposal of Excavated Materials
Term Contract
Post-Bid
Waltham, MA

S222--VISN 1 Solid Waste and Recycling Program Services
Results
Newington, West Haven, CT - Bedford, Brockton, Leeds, Randolph, West Roxbury, MA - Augusta, ME - Raeville, NE - Lee, Manchester, Portsmouth, NH - Providence, RI

PFAS Contaminated Soil and Sediment/Sludge
Post-Bid
Less than $200,000 est. value
Stow, MA

Hauling and Disposal
Infrastructure
Results
$183,175 est. value
Dracut, MA

Yard Waste Hauling and Composting
Post-Bid
$250,000 est. value
Newton Center, MA 02459

Removal, Handling and Disposal of Drinking Water Treatment Plant Residuals Material and Replacement of Sand Underdrain Media in Lagoon 2
Term Contract, Alteration
Results
$200,000 est. value
Lowell, MA 01854

Hauling and Disposal
Post-Bid
Dracut, MA

Sludge Hauling and Disposal From the Ayer Wastewater Treatment Facility
Term Contract
Post-Bid
Ayer, MA

Reported 09/16/2021 12:00 AM
Project Title

Pick Up, Transportation and Disposal of Catch Basin Cleanings and Street Sweepings

Physical Address View project details and contacts
City, State (County) Woburn, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pick Up, Transportation and Disposal of Catch Basin Cleanings and Street Sweepings as Needed. The contract period shall be for a period of one (1) base year with two (2) one (1) year option years. 10.4% combined MBE/WBE participation on construction contract awards; and, 17.9% combined MBE/WBE participation on design contract awards.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents