Last Updated | 06/24/2023 03:02 AM |
Project Title | Cashmere Sapinero Looping Waterline |
Physical Address | View project details and contacts |
City, State (County) | Pueblo West, CO 81007 (Pueblo County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000321447 Question Deadline 06/09/2023 at 4:00 PM MT Questions are submitted online No Bid Intent Not Available Description The project consists of but is not limited to the construction of a new six-inch and eight-inch C900 PVC potable waterline between Loma Dr. and the Assumed District Northern Boundary on Cashmere Ave. The project also consists of but is not limited to the demolition/abandonment of existing 6- inch AC waterline, service meters, and fire hydrants, salvage of appurtenances, construction of a new six- inch and eight-inch C900 PVC potable waterline on Sapinero Drive, and installation of four (4) 45 bends. Both projects will consist of placing new waterline via open trench methods including hydrants, valves, tie- ins, and appurtenances, erosion control, earthwork, cutting and patching and repaving of roads, and all appurtenances as specified and required for a complete and functional system. The project will install approximately 285 linear feet of new 6-inch C900 PVC waterline on Sapinero Drive and approximately 815 linear feet of new 6-inch C900 PVC waterline on Cashmere Ave north of East Loma Drive. All materials as indicated on the drawings will be provided by the contractor and must be installed, along with the completion of all associated site work relating to the new potable waterline. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Contact Information Michael Winters 7193009952 purchasing@pwmd-co.us |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |