Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

County Bridge #8 - Foundry Rd (T-231)
Demolition, New Construction, Infrastructure
Design
$1,255,518 CJ est. value
Stroudsburg, PA 18360

Pocono Auxiliary Water Tank
New Construction, Infrastructure
Bidding
$4,158,718 CJ est. value
Swiftwater, PA 18370

Emergency Operations Building - General, Plumbing, HVAC and Electrical
New Construction, Infrastructure - 22,000 SF
Bidding
$6,807,650 CJ est. value
Brodheadsville, PA 18322

HJP Park Swale and Grading Project
Post-Bid
Reeders, PA 18352

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sand Spring Run Stream Bank Restoration
Results
$500,000 to $900,000 est. value
Stroudsburg, PA

Water Softener Service
Results
Tobyhanna, PA

Black Buffalo 3D Corporation
Demolition, New Construction, Infrastructure - 150,000 SF
Pending Verification
$35,700,000 CJ est. value
Smithfield Township, PA 18301

Margaritaville Resort Village Pocono Mountains
Demolition, New Construction, Infrastructure
Pending Verification
$1,300,000,000 CJ est. value
Pocono Manor, PA 18349

209 BUS (SR 2012) Mt Tom
Infrastructure
Conception
$2,759,780 CJ est. value
East Stroudsburg, PA 18301

SR 715 over Pocono Creek
Demolition, New Construction, Infrastructure
Design
$3,855,006 CJ est. value
Henryville, PA 18332

Bushkill Outreach and Community Center
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
East Stroudsburg, PA 18302

Last Updated 01/31/2023 02:16 PM
Project Title

Minisink Drive Stormwater and Sanitary Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Tobyhanna Township, PA 18347   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

CLARIFICATION DEADLINE 1/5/2023 4:00 PM The Project consists of, but is not limited to, excavating, removing and/or abandoning in place existing stormwater and sanitary sewer piping, manholes, and appurtenances, excavating, providing and installing approximately 700-feet of 8-inch sanitary sewer PVC pipe, 5 manholes, appurtenances, fittings, sewer laterals, cleanouts, and connect to existing sewer collection system; excavating, providing and installing approximately 50-feet of 30-inch x 19-inch concrete elliptical stormwater pipe, endwalls, trash screens, and appurtenances; excavating, providing and installing approximately 50-feet of 2-feet x 5-feet concrete box culvert, endwalls, trash screens, and appurtenances; excavating and installing stormwater basins; roadside channels and liners, backfilling, compacting, soil testing, providing and installing bypass pumping (as required), pipeline and manhole testing, erosion and sedimentation controls, traffic control, and site restoration. Bid security shall be furnished in accordance with the Instructions to Bidders. The Arrowhead Lake Community Association hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received and select any bid of its choosing. Except as otherwise provided by law, no bidder may withdraw his bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of a government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents