Similar Projects
Septic System Installation
Alteration
Bidding
Harlan, KY

Lancaster Sanitary Sewer Extension Project
Infrastructure
Bidding
Lancaster, KY

LRS Septic Lateral Field Construction
Post-Bid
$25,000 to $100,000 est. value
Louisville, KY 40212

Richmond Utilities Board - Silver Creek Pump Station and Force Main
Post-Bid
Richmond, KY

Presidents Park Restroom and Sanitary Sewer Improvements Proiect
Results
Edgewood, KY 41017

Highland Pike Sanitary Sewer Replacement
Results
Fort Wright, KY

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

CMOM Gravity Line Cleaning and Inspection
Term Contract
Bidding
Louisville, KY

Taylor Fork Outfall Sewer
Post-Bid
Richmond, KY 40475

River Water Intrusion
Results
Fort Wright, KY

Liberty Road Trunk Sewer Wastewater System Improvements
Infrastructure
Bidding
Lexington, KY

Grimes Avenue Basin and Landscaping
Post-Bid
Owensboro, KY 42303

Repair of 6 Million Gallon Basin Modular Cover
Results
Kenton, KY 41048

Sewer Line Chemical Root Control
Infrastructure
Bidding
Lexington, KY

East 18" Interceptor Sewer
Post-Bid
Less than $1,397,000 est. value
Mount Washington, KY 40047

Last Updated 08/18/2021 08:37 AM
Project Title

LaGrange North Interceptor Sanitary Phase 1

Physical Address View project details and contacts
City, State (County) Lagrange, KY   (Oldham County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be bid upon is described as follows: Install 4 x 6’ precast sanitary manholes. Install 257 LF 24” PVC gravity sanitary line. Install 167 LF 36” steel casing. Remove 75 LF existing 10” force main (50 LF of which is in 24” steel casing under railroad) and replace with 75 LF 18” HDPE gravity sanitary. Install 1 x 6’ epoxy-lined manhole in Main Street. Reconnect existing 10” force main and 8” gravity sanitary. Bypass pumping/hauling as required for construction. North Interceptor has average flow of 100,000 gpd.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents