Similar Projects
Culvert Silt Removal
Infrastructure
Bidding
AZ

Concrete Slope Paving at 2 Locations
Post-Bid
Window Rock, AZ 86515

Modernization and District Paving Projects
Post-Bid
Less than $11,500,000 est. value
Chinle, AZ

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Pipelining and Drainage Services
Results

Professional Constructions Services for Street Rehabilitation Projects in St Michael and Many Farms
Post-Bid
Window Rock, AZ 86515

Drainage Improvement
Results
Less than $3,300,000 est. value
Saint Johns, AZ 85936

Design Build Construction Services of New Drainage Systems at Housing Management Offices
Post-Bid
Window Rock, AZ

On-Call Storm Pump Repair Services
Results

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Kinlichee D/B Paving Project
Results
AZ 86511

N5007-CTW/Newcomb Low Water Crossing
Infrastructure
Post-Bid
Window Rock, AZ

PEFO-Asphalt Trail Surface Preservation
Term Contract
Results
Chambers, Petrified Forest Natl Pk, AZ 86028

Rock Point Chapter Road Maintenance Project
Infrastructure
Post-Bid
Window Rock, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Reported 12/08/2021 12:00 AM
Project Title

Route N16-Inscription House

Physical Address View project details and contacts
City, State (County) Window Rock, AZ   (Apache County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Road Maintenance project for 3.5 miles Single & Double Coarse Chip Seals with Culvert Replacements From the BOP to 1.5 miles is 6-inch subgrade preparation, road reconditioning, 24-ft AB base course (5-inch thick), 22-ft double coarse chip seal, fog seal, permanent signage, drainage improvements, and 1-culvert cleanout. Then from 1.5-mile to EOP is a single course chip seal, chip seal repair, and 2 culvert replacements, and 1-culvert relocation. Total project length is approximately 3.5 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents