Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Cushing Public School - New Elementary School
New Construction, Infrastructure
Sub-Bidding
$41,000,000 CJ est. value
Cushing, OK 74023

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Asphalt Repairs for OSUIT-Okmulgee
Infrastructure
Post-Bid
Stillwater, OK

Lake McMurtry Nature Learning Trail
Infrastructure
Results
Stillwater, OK

Asphalt Overlay
Infrastructure
Results
Stillwater, OK

Energy Services Water Line Repairs
Term Contract
Construction
$250,000 CJ est. value
Stillwater, OK 74077

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 18
Infrastructure
Design
$500,000 CJ est. value
Yale, OK 74085

Resurface (Asphalt) - SH-51
Infrastructure
Bidding
$1,600,000 CJ est. value
Stillwater, OK 74074

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Last Updated 02/24/2023 03:14 AM
Project Title

Grade, Drain, and Surface - US 177

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2025
Bids Due View project details and contacts
Estimated Value $8,480,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-177: From the Cimarron Turnpike Spur, Extend North 6 Miles As of February 24, 2023, the project is in Design status. Anticipated letting month/year is February, 2025. Length : 3.000 Mi. OKDOT - Grade, Drain, and Surface - US 177 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents