Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Asphalt Resurfacing
Results
Hillsborough, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Widens I-95 to Eight Lanes and Reconstructs Interchanges from South of I-95 Business / US 301 (Exit 56) to North of SR 1002 (Long Branch Road - Exit 71) in Cumberland and Harnett Counties.
Results

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

Wrightsville Beach Paving Project
Results
Wrightsville Beach, NC

Last Updated 11/18/2020 04:22 AM
Project Title

Grading, Drainage, Paving and Structure

Physical Address View project details and contacts
City, State (County) NC   (Pitt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Items Lump Sum Ls Mobilization Lump Sum Ls Construction Surveying Lump Sum Ls Type Ii Modified Approach Fill, Station ******* (13+56.30 -l-) 300 Cy Undercut Excavation Lump Sum Ls Grading 1 Acr Supplementary Clearing & Grubbing 300 Cy Select Granular Material 300 Sy Geotextile For Soil Stabilization 10 Ton Foundation Conditioning Material, Minor Structures 20 Sy Foundation Conditioning Geotextile 32 Lf 15" Drainage Pipe 220 Ton Asphalt Conc Base Course, Type b25.0c 230 Ton Asphalt Conc Surface Course, Type s9.5b 25 Ton Asphalt Binder For Plant Mix 45 Cy Subdrain Excavation 200 Sy Geotextile For Subsurface Drains 34 Cy Subdrain Coarse Aggregate 200 Lf 6" Perforated Subdrain Pipe 1 Ea Subdrain Pipe Outlet 6 Lf 6" Outlet Pipe 2 Ea Masonry Drainage Structures 2 Ea Frame With Two Grates, Std 840.29 73 Lf Shoulder Berm Gutter 25 Lf Steel Beam Guardrail 5 Ea Additional Guardrail Posts 4 Ea Guardrail Anchor Units, Type Iii 4 Ea Guardrail End Units, Type Tl-3 65 Ton Rip Rap, Class Ii 6 Ton Rip Rap, Class b 260 Sy Geotextile For Drainage 21 Lf Supports, 3-Lb Steel u-Channel 2 Ea Sign Erection, Type e 332 Sf Work Zone Signs (Stationary) 94 Sf Work Zone Signs (Barricade Mounted) 64 Lf Barricades (Type Iii) 3,680 Lf Paint Pavement Marking Lines (4") 58 Ea Permanent Raised Pavement Markers 530 Lf Temporary Silt Fence 60 Ton Stone For Erosion Control, Class a 50 Ton Stone For Erosion Control, Class b 25 Ton Sediment Control Stone 0.5 Acr Temporary Mulching 100 Lb Seed For Temporary Seeding 0.5 Ton Fertilizer For Temporary Seeding 200 Lf Temporary Slope Drains 520 Lf Safety Fence 60 Cy Silt Excavation 1,155 Sy Matting For Erosion Control 100 Sy Coir Fiber Mat 45 Lf 1/4" Hardware Cloth 100 Sy Floating Turbidity Curtain 140 Lf Coir Fiber Wattle 85 Lf Coir Fiber Wattle Barrier 0.5 Acr Seeding & Mulching 0.5 Acr Mowing 50 Lb Seed For Repair Seeding 0.25 Ton Fertilizer For Repair Seeding 50 Lb Seed For Supplemental Seeding 0.25 Ton Fertilizer Topdressing 61 Lf Impervious Dike 10 Mhr Specialized Hand Mowing 7 Ea Response For Erosion Control 2 Ea Concrete Washout Structure 0.1 Acr Reforestation Structure Items Lump Sum Ls Removal Of Existing Structure At Station ************ (13+56.30 -l-) Lump Sum Ls Asbestos Assessment 1 Ea Pda Testing Lump Sum Ls Unclassified Structure Excavation At Station ******** (13+56.30 -l-) 25 Cy Class a Concrete (Bridge) Lump Sum Ls Bridge Approach Slabs, Station ************ (13+56.30 -l-) 3,670 Lb Reinforcing Steel (Bridge) 10 Ea Pile Driving Equipment Setup For *** Steel Piles (Hp 12 x 53) 725 Lf Hp12x53 Steel Piles 6 Ea Pile Redrives 140.3 Lf Vertical Concrete Barrier Rail 244 Ton Rip Rap Class Ii (2`-0" Thick) 271 Sy Geotextile For Drainage Lump Sum Ls Elastomeric Bearings 630 Lf 3`-0" x 2`-0" Prestressed Conc Cored Slabs 136 Lf Generic Structure Item Fiber Optic Conduit System

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents