Project Title | 60-Inch Force Main (NL-1A) between the Intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue |
Physical Address | View project details and contacts |
City, State (County) | North Miami Beach, FL 33162 (Miami-Dade County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $23,960,532 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is comprised of the installation of a 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main in the City of North Miami Beach that connects to an existing 72-inch Water and Sewer Department`s force main. The project is located between the intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue, in Sections 16, 17 & 18, Township 54S, Range 42E, in the City of North Miami Beach, Miami-Dade, Florida. Goal:The Small Business Enterprise - Construction goal is 6.83% and the Small Business Enterprise - Goods goal is 1.98% which is based on the construction estimateplus the 10% Contingency Allowance. A 10% Community Workforce Program (CWP) goal is applicable to this project. The scope of work includes, but is not limited to, the furnishing and installation of approximately 12,500 linear feet of 60-inch PCCP, including the corresponding fittings and valves; microtunnel installation at NE 151st Street and Biscayne Boulevard including two (2) 30-feet deep shafts, and approximately 600 linear feet of 84-inch steel casing and 60-inch PCCP; approximately 200 linear feet of 84-inch steel casing and 60-inch PCCP at FEC Right-of-Way; furnishing and installing one (1) 72-inch by 60-inch tapping saddle and one (1) 60-inch tapping valve required to make a tapping connection to an existing 72-inch force main at NE 151 Street east of Biscayne Boulevard; furnishing and installing six (6) Air Release Valves and fifteen (15) Automatic Air Release Valves; furnishing and installing six (6) 60-inch Flanged Plug valves; relocation of approximately 1,400 linear feet of 12-inch ductile iron water main including one(1) fire hydrant assembly; furnishing and installing approximately 270 linear feet of 16-inch force main; furnishing and installation of 28 access manholes; furnishing and installation of approximately 50 feet of 18-inch HDPE storm drainage pipe, approximately 50 feet of exfiltration trench and 2 storm inlets. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |