Similar Projects
The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

RidgeGate - Master Planning
New Construction - 1,200,000 SF
Conception
$10,000,000 CJ est. value
Lone Tree, CO 80124

Sanctuary on the Green (formerly known as Sanctuary West)
New Construction - 90,195 SF
Design
Fort Collins, CO 80521

Aspen Meadows
New Construction
Design
Colorado Springs, CO

Parterre
New Construction
Bidding
Thornton, CO 80602

Habitat For Humanity Neighborhood
New Construction
Post-Bid
Denver, CO 80014

General Contractor Services - Burlingame Phase III Modular Affordable Housing
Post-Bid
Aspen, CO

General Contractor and Construction Management Services for Dillon Valley Local Resident Housing
New Construction
Results
Frisco, CO 80443

Z--MEVE-REPAIR WATER DAMAGE
Renovation
Results
CO

Rock Canyon Subdivision
New Construction
Construction
$10,000,000 est. value
Colorado Springs, CO 80104

Nook At Shiloh Mesa
New Construction
Construction
Colorado Springs, CO 80908

Timbervine
New Construction
Pending Verification
Fort Collins, CO 80524

Florida Road Mixed Housing
New Construction
Pending Verification
Durango, CO 81301

Ridgewood Hills
New Construction
Conception
Fort Collins, CO 80525

Sterling Hills
New Construction
Design
Aurora, CO 80013

Last Updated 10/04/2021 10:30 AM
Project Title

Block 11 Workforce Housing

Physical Address View project details and contacts
City, State (County) Breckenridge, CO   (Summit County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Commenced 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager / General Contractor (CM/GC) for three, 3-story buildings with 9-units each (27 total) located in Breckenridge, Colorado. The purpose of this Request for Proposal (RFP) is to obtain relevant information, credentials, qualifications, experience, proposed project approach, and fee proposal from interested firms to allow the Town to select a CM/GC for the project.

Details

Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents