Similar Projects
New Ball Field at Eric W. Auer Killingworth Recreational Park - Town of Killingworth
Infrastructure
Conception
$500,000 CJ est. value
Killingworth, CT 06419

Shadow Lane Dam And Culvert Replacement - Town Of Cromwell
Infrastructure
Conception
$250,000 CJ est. value
Cromwell, CT 06416

Molecular & Life Science Building - Wesleyan University
New Construction, Build-out, Renovation, Infrastructure - 193,000 SF
Design
$10,000,000 CJ est. value
Middletown, CT 06459

Wesleyan Neighborhood Preschool
New Construction, Infrastructure - 7,000 SF
Design
$1,000,000 CJ est. value
Middletown, CT 06457

Sewer Rehabilitation Within Various Sub-Basins (Basins 25/26 Additional Basins)
Infrastructure
Bidding
$200,000 CJ est. value
Middletown, CT 06457

2023 Road Paving Program
Infrastructure
Bidding
$1,500,000 CJ est. value
Clinton, CT 06413

Bridge Road Sidewalks
Infrastructure
Post-Bid
Haddam, CT

Harbor Management Ferry Road Added Floating Docks and Ramps
Infrastructure
Post-Bid
Old Saybrook, CT 06475

Installation of Concrete Sidewalks and Extruded Concrete Curbing
Results
Middletown, CT

Main Street and Geer Street Connectivity Sidewalk Project
Infrastructure
Results
Cromwell, CT

Big Y Foods / Middletown
New Construction, Infrastructure - 51,892 SF
Construction
$22,000,000 CJ est. value
Middletown, CT 06457

Quality Propane Truck Storage
New Construction, Infrastructure - 97,500 SF
Pending Verification
$10,000,000 CJ est. value
Clinton, CT 06413

Middletown Riverfront Redevelopment
Demolition, New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Middletown, CT 06457

Tennis Court - Watrous Park - Town Of Cromwell
Infrastructure
Conception
$900,000 CJ est. value
Cromwell, CT 06416

Main Street Mixed-Use
Renovation, Infrastructure - 46,000 SF
Design
$6,300,000 CJ est. value
Middletown, CT 06457

Last Updated 04/21/2023 11:11 AM
Project Title

West Street Sidewalk Improvements and Intersection Alignment

Physical Address View project details and contacts
City, State (County) Cromwell, CT 06416   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Question dead line April 14 2023 at 4 PM Construction Period 180 Calendar days , start May 15,2023 The Town of Cromwell is seeking bids for the construction of sidewalks on West Street from Lincoln Road southeast to Timber Hill Road with connection to Town Hall, the realignment of Allen Road intersection with West Street and the removal of a portion of Lincoln Road. Funding provided by the State of Connecticut Urban Act Grant administered by the Connecticut Department of Energy and Environmental Protection (DEEP). Question Deadline 04/14/2023 at 4:00 PM ET Any technical questions regarding this bid shall be made in writing via email directed to Jon Harriman, P.E., Town Engineer jharriman@cromwellct.com. All questions, answers, and/or addenda, as applicable, will be posted on the Town's website at www.cromwellct.com (Upon entering

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents