Similar Projects
EP-177 Washington Road Sidewalks
Bidding
East Point, GA

Parking Lot Upgrade Services
Bidding
$200,000 est. value
Atlanta, GA

Lester Road Pedestrian Improvements
Post-Bid
Union City, GA 30291

Brady Mobility Facility Parking Lot Restriping
Post-Bid
Atlanta, GA

Construction Services for South STEM School Site
Results
Less than $1,325,800 est. value
Fairburn, GA 30213

Lake Forest Elementary School Recreational Improvements
Results
Less than $245,000 est. value
Sandy Springs, GA

Kipp Vision Modular Health Clinic
New Construction
Construction
Atlanta, GA 30315

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

Hapeville CDBG Park Improvements
New Construction
Bidding
Hapeville, GA 30354

Buckhead CID West Village Streetscape Project
Post-Bid
Atlanta, GA 30301

Sandy Springs Circle Streetscapes
Results
Sandy Springs, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Stadium Red Lot Bus Only Lane
Bidding
Atlanta, GA 30315

Ground Lease and Development - Godby Road
Post-Bid
Atlanta, GA 30303

TS137 Johnson Ferry at Glenridge Connector SidePath
Results
Sandy Springs, GA

Last Updated 02/04/2020 07:53 AM
Project Title

Bill Kennedy Way Interim Trail-User Safety Improvements

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interim trail along Bill Kennedy Way, between Gibson Street and Glenwood Avenue in Southeast Atlanta. construction of a buffered multi-use path including, but not limited to, sidewalk demolition, installation of concrete medians, barriers and planters, roadway milling and paving, re-striping of new and existing roadways, installation of new signage, signal timing and striping for a pedestrian scramble phase and shifting of existing traffic signal heads.

Details

Site Development.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents