Similar Projects
Violet's Garden Subdivision
New Construction
Conception
$21,500,000 est. value
Fort Wayne, IN

Mason's Ridge Subdivision
New Construction
Conception
Fort Wayne, IN

Village Premier Mixed Use Development
New Construction
Design
Fort Wayne, IN 46806

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

Pierson Drain Improvements Phase I
Infrastructure
Bidding
$1,694,890 CJ est. value
Fort Wayne, IN 46802

Pontiac Street Streetscape
Infrastructure
Bidding
$700,000 CJ est. value
Fort Wayne, IN 46803

RFQ - Franke Park Renaissance Project Phase 1
Renovation, Infrastructure
Sub-Bidding
$16,755,000 CJ est. value
Fort Wayne, IN 46808

Weatherization Maintenance/Repairs
Renovation
Post-Bid
Fort Wayne, IN 46803

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

Village Premier - Residential/Mixed Use Development
Results
Fort Wayne, IN 46806

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Wedge - Mixed-Use Development
Renovation
Construction
Fort Wayne, IN 46808

Cedar Grove Subdivision
New Construction
Pending Verification
Yoder, IN

New Subdivision Development
New Construction
Pending Verification
Fort Wayne, IN 46895

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Last Updated 10/13/2022 01:34 PM
Project Title

Tiburon/Livingston Lakes Extended

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46818   (Allen County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 13, 2022, this project is in design phase, seeking site plan approval. An Architect has not been disclosed. A developer has been disclosed. A timeline for construction has yet to be announced, although not likely to start until mid 2023.

Details

Acre, 82 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents