Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Stoker District Sanitary Sewer Improvements
Infrastructure
Bidding
$825,000 CJ est. value
Kochville Township, MI 48604

Saginaw Intermediate School District Transitions Center Sidewalk Replacement
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Saginaw, MI 48603

Saginaw Intermediate School District Transitions Center Sidewalk Replacement
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Saginaw, MI 48603

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Streets Improvement Project
Results
Chesaning, MI

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Havens Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Central Restroom & Concessions Building - Saginaw Children's Zoo
New Construction, Infrastructure - 1,150 SF
Bidding
$300,000 CJ est. value
Saginaw, MI 48601

Asphalt Paving
Infrastructure
Post-Bid
Hemlock, MI 48626

North Juvenile Center Parking Lot
Infrastructure
Results
Saginaw, MI 48603

New Comprehensive High School Deep Foundations
Infrastructure
Post-Bid
Saginaw, MI

0.72 MI of Hot Mix Asphalt Resurfacing, Concrete Curb and Gutter
Infrastructure
Results
MI

Last Updated 12/02/2022 12:10 PM
Project Title

Village of Birch Run Phase III Streetscape

Physical Address View project details and contacts
City, State (County) Birch Run, MI 48415   (Saginaw County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Village of Birch Run Phase III Streetscape - Beyer Road to Dixie Highway The project consists of streetscape improvements including landscaping, lighting, sidewalks, pavement milling, and resurfacing. Landscaping, Conduit/Electrical/Telemetry, Pavement - Marking, Street/Road Concrete Repair, Sidewalks/Curbs/Gutters, Street/Road Pavement Marking, Street/Road Asphalt Resurfacing and Milling, Concrete Pavement, Paving (Highway, Road or Street), Street/Road Asphalt Milling, ADA Curb Ramps, Curbs, Paving (Asphalt or Concrete)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents