Similar Projects
Right of Way - US059
Infrastructure
Conception
$7,000,000 CJ est. value
Stilwell, OK 74960

Right of Way - SH008
Infrastructure
Conception
$500,000 CJ est. value
Cherokee, OK 73728

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

RFQ - New Greenhouse/Processing Facility Construction
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Gracemont, OK 73042

Beaver Municipal Airport - Apron Reconstruction
Demolition, Infrastructure
Bidding
$850,000 CJ est. value
Beaver, OK 73932

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Waterline Replacement
Infrastructure
Results
$2,216,905 est. value
Oklahoma City, OK

Water System Improvements
Infrastructure
Results
$232,000 to $237,000 est. value
El Reno, OK 73036

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

The Community at Surrey Plaza
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Oklahoma City, OK 73099

Utilities - SH008
Infrastructure
Conception
$500,000 CJ est. value
Cherokee, OK 73728

Intersect Modif
Infrastructure
Design
$2,600,000 CJ est. value
Binger, OK 73009

Last Updated 06/06/2023 01:02 AM
Project Title

Hugo AMI Meter Improvements

Physical Address View project details and contacts
City, State (County) Hugo, OK 74743   (Choctaw County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,463,193 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing AMI Meter Improvements to include replacement of approximately 2,377 meters and appurtenances as required. AMI Meter Improvements to include replacement of approximately 2,500 meters and appurtenances as required.It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. Addenda and project changes will ONLY be posted to CivCast and it is the responsibility of the contractor to check the site periodically. No verbal questions will be responded to. Please submit through CivCast or by emailing bidding@wallengineering.com. Deadline for questions submittal is May 30th, 2023. Questions through CIVCAST will be prioritized over those received by email. Only responses issued via written Addenda are binding. Complete sets of Bidding Documents must be used in preparing bids. Neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete or incorrectly printed / scaled sets of bidding documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents